Guides – Simply Stakeholders https://simplystakeholders.com Purpose-built Stakeholder Relationship Management Software Fri, 11 Sep 2026 08:00:15 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.4 https://simplystakeholders.com/wp-content/uploads/2024/11/android-icon-192x192-1-118x118.png Guides – Simply Stakeholders https://simplystakeholders.com 32 32 What is Public Consultation? A Practical Guide for Local Government https://simplystakeholders.com/resources/guides/public-consultation-guide/ Tue, 11 Aug 2026 01:34:24 +0000 https://simplystakeholders.com/?post_type=guide&p=4833 What Is Public Consultation?

Public consultation is the structured process of seeking input from people who may be affected by a government decision, policy, project or service before that decision is made. Effective public consultation helps councils make better decisions, reduce project risks, build community trust and demonstrate transparency.

Three things separate real public consultation from the appearance of it:

  1. There is a genuine decision still open. You are asking because the answer could change what you do. If the road is already funded, designed, and scheduled, asking the community whether they want it is not consultation.
  2. There is a defined audience who will be affected. Consultation isn’t a broadcast to everyone; it’s a deliberate effort to reach the residents, businesses, community groups, and other stakeholders who carry the consequences of the decision.
  3. There is a feedback loop that closes. People who contribute hear back about what you did with their input and why. Without the loop, participation collapses the next time you ask, because last time, nothing came of it.

The International Association for Public Participation (IAP2) places consultation on a spectrum of engagement that runs from inform through consult, involve, collaborate, and empower. Consultation sits early on that spectrum: you’re obtaining feedback on analysis, alternatives, and decisions, and promising to keep people informed and to acknowledge how their input shaped the outcome. It’s worth knowing where consultation sits, because a lot of friction in local government comes from a council promising consult while the community expected collaborate — or vice versa.

Every day, local governments make decisions that shape the places where people live, work and play. Whether it’s building a new sporting facility, changing parking restrictions, updating a planning scheme, introducing a waste collection service or developing a long-term strategic plan, those decisions affect communities in different ways.

Public consultation provides an opportunity for residents, businesses, community organisations and other stakeholders to contribute their knowledge, perspectives and concerns before decisions are finalised.

Done well, public consultation improves decision-making and strengthens trust.

Done poorly, it can leave communities feeling ignored, frustrated and less willing to participate in future engagement.

Yet despite significant investment in online consultation platforms and digital engagement tools, many organisations still struggle to answer fundamental questions such as:

  • Are we engaging the right people?
  • Are we building trust with our community?
  • Are we learning from previous consultations?
  • Are we remembering the commitments we’ve made?
  • How are our stakeholder relationships changing over time?

These questions highlight an important distinction.

Public consultation is an activity. Community engagement is an organisational capability.

The most successful councils recognise that public consultation isn’t simply about collecting submissions; it is about building long-term relationships that enable better decisions for years to come.

This guide explains what public consultation is, how it differs from community engagement, how the IAP2 Spectrum supports effective participation, and why many leading organisations are evolving from project-based consultation towards stakeholder intelligence.

Public consultation vs engagement vs participation

These terms get used interchangeably, and the blur causes real problems when you’re setting expectations.

Community engagement is the umbrella. It covers the whole relationship between a council and its community over time — every touchpoint, campaign, conversation, and decision. Consultation is one activity that lives inside engagement.

Public consultation is a specific, time-bound activity with a start, an end, and a decision attached. You open it, you promote it, you gather input, you close it, and you report back.

Community participation describes how deeply people are involved. A survey is low participation; a resident sitting on an advisory panel that co-designs a plan is high participation. Consultation can be shallow or deep depending on the methods you choose.

Getting these distinctions right is important. When a council says “we consulted” but the community expected to help make the decision, the gap between those two words is where tempers fray and trust erodes.

Why Public Consultation Matters More Than Ever

Community expectations have changed dramatically over the past decade. People no longer expect government to inform them about decisions. They expect to be involved.

Residents want earlier engagement, greater transparency and genuine opportunities to influence outcomes. They also expect governments to remember previous conversations rather than treating every consultation as an isolated event.

At the same time, councils face increasing pressure to deliver more consultation with limited resources. Infrastructure investment is growing. Planning decisions are becoming more complex. Communities are more connected, and more vocal than ever before. Social media enables concerns to spread rapidly, while expectations around openness and accountability continue to rise.

Around the world, governments are strengthening requirements for openness and public participation. In Australia, councils must comply with state-based legislation governing community engagement, planning and public consultation.

Internationally, similar trends are emerging. California’s SB 707 (Brown Act Modernization Act) requires many local governments to improve public access to council meetings by providing two-way remote participation, translating agendas into commonly spoken community languages, adopting policies for technology disruptions, and taking additional steps to encourage residents to participate. The legislation recognises that meaningful participation increasingly depends on reducing barriers to access rather than simply holding meetings in public.

These changes reflect a broader shift in public expectations. Communities increasingly expect engagement to be:

  • accessible
  • inclusive
  • transparent
  • multilingual where appropriate
  • available through both in-person and digital channels

For councils, this means consultation is no longer just about complying with statutory notice periods. It is about designing engagement processes that are genuinely accessible to the people they are intended to serve.

Against this backdrop, effective public consultation has become a strategic capability rather than simply a legislative requirement.

Good consultation helps councils:

Make better decisions

Local communities possess knowledge that technical specialists often don’t. Residents understand neighbourhood history. Businesses understand economic impacts. Community organisations understand local needs. Early engagement helps uncover valuable information before projects are finalised.

Build trust and confidence.

Research consistently shows that people are more likely to accept decisions—even ones they disagree with—when they believe the process was fair, transparent and genuinely considered their input. Trust is built less by the final decision than by the quality of the engagement process.

Reduce project risk

Many disputes arise because concerns were identified too late.

Early consultation can reveal:

  • emerging community opposition
  • misinformation
  • political sensitivities
  • accessibility concerns
  • environmental impacts
  • cultural heritage issues

Addressing these early is often significantly less expensive than responding later in the process, after designs are complete or construction has begun.

Improve governance

Public consultation provides evidence that decisions have been informed by community input rather than made in isolation. Good governance includes:

  • documented consultation processes
  • transparent decision-making
  • clear reporting
  • auditable records
  • accountability for commitments
Create organisational knowledge

Perhaps the greatest long-term benefit of consultation is the knowledge it generates. Every conversation improves understanding of:

  • stakeholder priorities
  • community concerns
  • influential groups
  • local history
  • emerging issues
  • relationship dynamics

When captured effectively, this knowledge becomes a valuable organisational asset that improves every future consultation.

Infographic listing the benefits of good public consultation

The most valuable outcome of a consultation isn’t the consultation report—it’s the organisational knowledge created through every stakeholder interaction.

Public Consultation vs Community Engagement

The terms public consultation and community engagement are often used interchangeably. However, there is an important distinction. Public consultation is one important component of community engagement, but it is not the whole picture.

Community engagement is broader, longer-term and relationship-focused. Consultation is usually project-focused.

Public Consultation Community Engagement
Focuses on a specific proposal or decision Focuses on ongoing relationships
Usually has a defined start and finish Continuous
Often required by legislation Strategic organisational practice
Seeks feedback Builds trust
Project-specific Organisation-wide
Measures participation Measures relationships and community confidence

Consider a council developing a new playground. The consultation may run for six weeks. Residents complete surveys. Parents attend workshops. Feedback is analysed. A report is produced. The consultation closes.

Community engagement, however, continues long after the playground opens. Council officers continue speaking with local residents. Maintenance issues are recorded. Future upgrades are discussed. Relationships continue developing. Every interaction contributes to a deeper understanding of the community.

This distinction becomes increasingly important because communities judge engagement over years—not individual projects.

Every consultation ends. Community relationships don’t.

Public Consultation vs Stakeholder Engagement

Another common source of confusion is the relationship between public consultation and stakeholder engagement. Although closely related, they have different objectives.

Public consultation focuses primarily on obtaining community input into decisions.

Stakeholder engagement encompasses all interactions between an organisation and the people, businesses and organisations who affect, or are affected by its activities.

For councils, stakeholders extend well beyond residents. They include:

  • businesses
  • community organisations
  • sporting clubs
  • schools
  • Traditional Owners
  • environmental groups
  • developers
  • utility providers
  • emergency services
  • neighbouring councils
  • government agencies

Some of these stakeholders may never participate in a formal consultation, yet maintaining strong relationships with them remains essential.

Stakeholder engagement includes activities such as:

  • meetings
  • briefings
  • relationship management
  • issue resolution
  • ongoing communication
  • partnership development
  • commitment tracking

Public consultation is one important engagement activity. Stakeholder engagement is the broader discipline that supports long-term organisational relationships.

Increasingly, leading councils are moving beyond simply managing consultations towards managing stakeholder relationships across the entire organisation.

Consultation collects opinions. Stakeholder engagement builds relationships. Stakeholder intelligence turns those relationships into better decisions.

The memory problem behind poor consultation

Here’s the pattern almost every council knows. A community member has been to five consultations over three years. They’ve raised the same concern about traffic near the primary school every single time. But each consultation was run by a different officer, logged in a different spreadsheet, or captured in notes that left with the person who ran the session. So every time, that resident starts from zero — re-explaining a concern the organisation should already hold.

From the resident’s side, it feels like being unheard. From the council’s side, it’s not indifference, it’s that the organisation’s memory of the relationship is scattered across inboxes, documents, have-your-say project sites, and people who have since moved on. When staff turn over, the relationship intelligence walks out the door with them, and the next project starts from a blank page.

This is what we call relationship debt: the stakeholder-management failures that accumulate quietly, like financial debt, but can’t be refinanced. You pay the interest in slower approvals, harder consultations, and communities that arrive already sceptical because last time didn’t go anywhere. Every forgotten commitment and every uncoordinated contact adds to the balance, and it compounds long before anyone names it.

Understanding the IAP2 Spectrum

One of the most widely recognised frameworks for public participation is the IAP2 Spectrum of Public Participation, developed by the International Association for Public Participation (IAP2). The Spectrun is currently under review and it is expected that a new version of it will be released later in 2026.

The original Spectrum recognises that not every decision requires the same level of community participation. Some decisions simply require informing the community. Others require consultation. Some benefit from collaboration or even shared decision-making. The Spectrum defines five levels of participation.

Inform

Consult

Involve

Collaborate

Empower

Public Promise We will keep you informed. We will listen to you, acknowledge your concerns and provide feedback on how public input influenced the decision. We will work with you throughout the process. We will partner with you in each aspect of the decision. You will make the final decision.
Description At this level, communication is one-way. The objective is to ensure the community understands what is happening. This is the level most commonly associated with public consultation. The organisation actively seeks community views before making a decision. Rather than seeking feedback at specific points, organisations involve stakeholders continuously during project development. Collaboration involves shared problem-solving and joint development of solutions At the highest level of participation, decision-making authority rests with the community.
Typical methods
  • project websites
  • newsletters
  • media releases
  • fact sheets
  • information sessions
  • surveys
  • online engagement portals
  • written submissions
  • public meetings
  • pop-up consultations
  • stakeholder interviews
  • workshops
  • design charrettes
  • community reference groups
  • collaborative planning sessions
  • co-design workshops
  • partnership committees
  • advisory panels
  • participatory budgeting
  • community voting
  • citizen juries
Suitable for
  • project updates
  • construction notices
  • emergency communications
  • legislative changes already determined
  • draft strategies
  • transport projects
  • planning proposals
  • service reviews
  • park upgrades
  • precinct planning
  • masterplans
  • major infrastructure
  • long-term strategic planning
  • urban renewal
  • regional development
  • community-led planning
Empowerment is appropriate only where legislation and governance arrangements permit community decision-making.

Beyond the IAP2 Spectrum: Defining the Purpose of Engagement

While the IAP2 Spectrum helps determine the appropriate level of public participation, it doesn’t answer another equally important question:

Why are we engaging in the first place?

Before selecting engagement methods or launching a consultation, councils should be clear about the primary purpose of engagement.

One useful way of thinking about this is the Capire Engagement Triangle, a planning framework that encourages practitioners to define the intended outcome of engagement before deciding how to engage. The framework identifies three broad objectives:

  • Informing decisions – gathering community insights to help decision-makers better understand issues, preferences and local knowledge.
  • Strengthening decisions – improving the quality, legitimacy and community acceptance of decisions by incorporating diverse perspectives.
  • Sharing knowledge – creating opportunities for councils and communities to learn from one another, recognising that both bring valuable knowledge, lived experience and expertise to the conversation. This reflects Capire’s updated model, which replaced the earlier concept of “capacity building” with “sharing knowledge” to emphasise mutual learning rather than a one-way transfer of expertise.

The Engagement Triangle reminds us that engagement methods should follow engagement objectives, not the other way around.

For example, if the objective is simply to gather feedback on a draft parking strategy, an online survey may be appropriate. If the objective is to build shared understanding around a contentious urban renewal project, workshops, deliberative forums and ongoing stakeholder engagement are likely to be more effective.

The same engagement tool can produce very different outcomes depending on the intent behind its use.

The Community Engagement Maturity Model

The IAP2 Spectrum helps organisations choose the appropriate level of public participation for a specific decision. It does not measure how mature an organisation is at community engagement.

Two councils can both follow the IAP2 Spectrum and run technically successful consultations. Yet one consistently builds trust, learns from every project and strengthens stakeholder relationships, while the other begins each consultation with new spreadsheets, new mailing lists and little organisational memory.

The difference is organisational maturity.

Increasingly, leading practice recognises that effective public participation depends not only on individual projects but also on the organisation’s systems, governance, culture and ability to learn over time.

Infographic depicting the 5 stages in a community engagement maturity model

The Community Engagement Maturity Model describes how organisations evolve from simply publishing information to generating stakeholder intelligence that supports better strategic decisions.

Level 1 — Publish

“We tell the community.”

Communication is primarily one-way.

Success is measured by information distribution.

Typical technology:

  • website
  • newsletters
  • media releases

Typical question:

Have we informed the community?

Level 2 — Consult

“We ask the community.”

The organisation begins seeking feedback through surveys, consultation portals and public meetings.

Engagement is largely project-based.

Success is measured through:

  • submissions
  • participation
  • attendance
  • website visits

Typical question:

How many people participated?

Level 3 — Engage

“We build relationships.”

Consultations become connected rather than isolated. Stakeholder history is retained. Departments coordinate engagement. Commitments are tracked.

Success is measured through:

  • relationship quality
  • stakeholder satisfaction
  • consistency
  • trust

Typical question:

How are our relationships evolving?

Level 4 — Understand

“We generate stakeholder intelligence.”

The organisation begins identifying patterns across thousands of interactions.

Leaders understand:

  • emerging issues
  • stakeholder influence
  • recurring concerns
  • community sentiment
  • engagement gaps

Typical question:

What is our community telling us?

Level 5 — Predict

“We anticipate community outcomes.”

Artificial intelligence and stakeholder intelligence help organisations identify emerging risks before they become major issues.

Leaders can proactively identify:

  • deteriorating relationships
  • likely opposition
  • missed commitments
  • misinformation
  • communities requiring additional engagement

Typical question:

What is likely to happen next?

Community Engagement Maturity at a Glance

Level Organisation Thinks… Focus Primary Measure
1. Publish “People need information.” Communication Reach
2. Consult “People should have their say.” Collecting feedback Participation
3. Engage “Relationships matter.” Relationship management Trust and consistency
4. Understand “Data should improve decisions.” Stakeholder intelligence Organisational insight
5. Predict “We should anticipate issues.” Strategic decision support Better decisions and reduced risk

 

Bringing the Frameworks Together

Each of the frameworks discussed in this guide answers a different planning question.

Framework Key Question Purpose
IAP2 Spectrum How much participation is appropriate? Select the appropriate level of public participation.
Capire Engagement Triangle Why are we engaging? Clarify the purpose and desired outcome of engagement before selecting methods.
Community Engagement Maturity Model How capable is our organisation? Assess how effectively engagement is embedded across governance, systems, culture and stakeholder relationships.

Together, these frameworks provide a practical foundation for designing high-quality engagement:

  1. Clarify the purpose (Capire Engagement Triangle).
  2. Choose the appropriate level of participation (IAP2 Spectrum).
  3. Select the right engagement methods (Consultation Plan).
  4. Capture and apply organisational learning (Community Engagement Maturity Model).

Too often, organisations start by asking “Should we run a survey or a workshop?” Mature organisations start by asking “What are we trying to achieve?” When the purpose of engagement is clear, the appropriate methods—and the measures of success—become much easier to define.

Characteristics of Mature Community Engagement Organisations

As organisations mature, community engagement becomes less dependent on individual staff members and more embedded in governance, systems and organisational culture.

Highly mature organisations typically demonstrate the following characteristics:

✔ Clear engagement principles adopted across the organisation

✔ Consistent consultation planning and reporting

✔ Shared stakeholder information rather than isolated spreadsheets

✔ Clear ownership of stakeholder relationships

✔ Executive visibility of emerging community issues

✔ Continuous evaluation and improvement

✔ Organisational learning from previous consultations

✔ Technology that supports—not replaces—good engagement practice

These organisations don’t simply run better consultations. They become better at listening, learning and responding over time.

A consultation platform helps you run a consultation. A mature engagement organisation remembers every conversation, learns from every interaction and continuously strengthens its relationship with the community.

Why councils run government consultations

Government consultations aren’t optional good manners. For local government they’re driven by a mix of legal obligation, better decisions, and social licence.

Statutory requirements. Across Australian states, local government acts and planning frameworks require councils to consult on specific decisions — community strategic plans, significant policy changes, certain development applications, road closures, changes to community facilities, and more. The exact triggers vary by state, but the principle is consistent: some decisions can’t be made behind closed doors.

Better decisions. The people who use a park, drive a corridor, or run a business on a main street hold knowledge your team doesn’t have. Consultation surfaces the operational reality that plans miss: the intersection that’s dangerous at school pick-up, the drainage that already floods, the loading zone a business depends on. Skipping that input doesn’t make the problem disappear; it just moves it to the complaints inbox after construction.

Social licence and risk. This is where the cost of poor consultation shows up. When communities feel unheard, opposition organises, projects stall, and relationships sour in ways that outlast the individual decision. For a council, delay isn’t only a budget line, it’s the credibility you spend every time you go back to the same community for the next project.

The public consultation process, step by step

1. Define the decision and the scope

Before you write a single question, be honest about what’s actually negotiable. Is the location fixed but the design open? Is the budget capped? What feedback could genuinely change the outcome, and what can’t? Communities respond well to clear scope and badly to the discovery that they were consulted on things that were never up for grabs.

2. Identify and map your stakeholders

Work out who is affected and how. For a town centre upgrade that means adjacent traders, residents on the block, accessibility advocates, the local chamber of commerce, delivery operators, and the people who simply pass through. Stakeholder mapping is a clear framework for ensuring that you identify all the appropriate and relevant stakeholders and can plan your consultation appropriately for each group..

3. Choose your methods

Match the method to the audience and the depth of participation you need. Surveys and online submission forms reach breadth. Drop-in sessions, workshops, and pop-ups at the local market reach people who won’t fill in a form. Advisory panels and deliberative forums reach depth. Most council consultations blend several methods so that a working parent and a retiree both have a realistic way to contribute.

4. Promote it and lower the barriers

A consultation nobody knows about produces feedback from nobody who matters. Use the channels your community actually uses — local Facebook groups, the library noticeboard, rates notices, schools, culturally appropriate channels for communities that don’t engage in English. The goal is to make participating easy for the people who are hardest to reach, not just convenient for the people who always show up.

5. Gather, record, and analyse the feedback

This is where many councils lose control. Feedback arrives across email, submission portals, workshop notes, phone calls, and social media, and it lands with different officers in different departments. If that input isn’t captured against the stakeholder who gave it, you lose the thread, and when the same resident raises the same concern six months later, nobody knows it’s the second time.

6. Close the loop and report back

Publish what you heard, what you decided, and why; including where you went a different way than the feedback suggested, and your reasons. Closing the loop is the single most powerful thing you can do to make the next consultation work, because it proves participation is worth people’s time.

What separates good consultation from box-ticking

You can run every step above and still produce consultation the community doesn’t trust. The difference usually comes down to a few things.

You consulted early enough to matter. Feedback gathered while options are still open changes decisions. Feedback gathered a fortnight before a locked-in vote changes nothing, and everyone knows it.

You reached the people who don’t usually turn up. Consultation that only hears from the organised and the retired isn’t representative, and a decision built on it is fragile.

You remembered what people already told you. Communities have long memories. When a resident makes the same point they made in three previous consultations and your team treats it as new, the message received is that nobody was listening the first three times.

That last point is where most councils are quietly exposed , and it’s less about effort than about memory.

Why a spreadsheet isn’t a consultation plan

Most councils manage consultation with some combination of a spreadsheet, a shared drive, an email folder, and an engagement platform for the public-facing part. Each does part of the job. None of them holds the whole relationship.

A survey tool captures responses but not the history of the person who responded. A spreadsheet captures a stakeholder list but not the last three interactions or the commitment someone made on the council’s behalf. An engagement platform runs the campaign but doesn’t tell your roads team what your planning team already promised the same resident.

This is the distinction between engagement tools and stakeholder relationship management (SRM). Engagement platforms are built for mass consultation — running the campaign, collecting comments and feedback. SRM is built for organisational intelligence — remembering who your stakeholders are, what they care about, what was said, what was promised, and by whom, across every department and every project, so the knowledge survives staff turnover.

A council that treats consultation as a series of one-off campaigns will keep paying relationship debt. A council that treats it as a continuous relationship, where every consultation builds on a shared, organisation-wide memory of the community, compounds trust instead.

How to Build a Consultation Plan?

A consultation plan is a documented strategy that outlines how an organisation will engage stakeholders throughout a project or decision-making process.

Depending on the size and complexity of the project, a consultation plan might be a two-page document or a comprehensive engagement strategy.

At a minimum, every consultation plan should answer six key questions:

  • Why are we consulting?
  • Who needs to be involved?
  • What decisions are open to influence?
  • How will engagement occur?
  • How will feedback be used?
  • How will we know whether the consultation was successful?

Without clear answers to these questions, consultation can quickly become unfocused, inconsistent or perceived as tokenistic. More importantly, a good consultation plan shifts the focus from “How will we run this consultation?” to “How will this consultation help us make a better decision?”

Step 1: Define the Purpose

Every consultation should begin with a clearly articulated purpose.

This sounds obvious, but many consultations begin with a predetermined engagement method, such as launching an online survey, before anyone has agreed on the desired outcome.

Instead, start by asking:

  • What decision are we trying to make?
  • What problem are we trying to solve?
  • Why are we seeking community input?
  • What aspects of the proposal can genuinely change?
  • What has already been decided?

Being transparent about these questions helps build trust and sets realistic expectations from the outset.

For example, if funding has already been secured for a new sports facility, consultation may focus on its design, location of amenities or operating hours, not whether the facility should be built at all.

Communities generally accept constraints when they are explained honestly. They become frustrated when they discover them after participating.

Step 2: Identify Your Stakeholders

One of the biggest mistakes organisations make is assuming that consultation is simply about communicating with nearby residents. In reality, most council decisions affect a much broader network of stakeholders.

For example, a proposal to redevelop a local streetscape may involve:

  • adjacent residents
  • local businesses
  • accessibility advocates
  • public transport operators
  • cycling groups
  • emergency services
  • schools
  • Traditional Owners
  • utility providers
  • heritage organisations
  • elected representatives
  • neighbouring councils

Each group may have different concerns, expectations and preferred ways of engaging.

A stakeholder analysis helps determine:

  • who is affected
  • who has influence
  • who has specialist knowledge
  • who may experience disproportionate impacts
  • who may require tailored engagement approaches

Rather than treating all stakeholders equally, councils should prioritise engagement based on the level of impact and the significance of each stakeholder’s relationship with the project. Doing a quick stakeholder analysis would be really helpful at this stage.

Step 3: Choose the Right Engagement Methods

Not every consultation method is appropriate for every project. A neighbourhood playground upgrade requires a different engagement approach to developing a twenty-year Community Strategic Plan.

Your consultation methods should be influenced by:

  • the purpose of engagement
  • the appropriate IAP2 participation level
  • stakeholder preferences
  • project complexity
  • available resources
  • accessibility requirements
  • legislative obligations

Using multiple complementary methods often produces the best outcomes.

For example:

  • Online surveys can gather broad community sentiment.
  • Workshops help explore complex issues.
  • Pop-up sessions reach people who may never attend formal meetings.
  • Interviews provide valuable insights from key stakeholders.
  • Community reference groups support long-term collaboration on major projects.

No single engagement method reaches every part of the community. The objective should be inclusion, not convenience.

Step 4: Develop a Communication Plan

Effective consultation is built on clear, consistent communication before, during and after engagement.

Your communication plan should identify:

  • key messages
  • communication channels
  • timelines
  • spokespersons
  • branding
  • accessibility requirements
  • translation needs
  • media management

Importantly, communication should continue after consultation closes.

Participants deserve to know:

  • what feedback was received
  • what themes emerged
  • how input influenced decisions
  • why some suggestions were not adopted
  • what happens next

Closing the feedback loop is one of the simplest, and most effective ways to build community trust.

Step 5: Plan for Analysis and Reporting

Collecting feedback is only half the job. The real value of consultation comes from understanding what the feedback means. Major consultations can generate thousands of comments across surveys, submissions, emails, meetings and social media. Without a structured approach, valuable insights can easily be overlooked.

Your consultation plan should define:

  • how feedback will be analysed
  • who is responsible
  • reporting formats
  • issue categorisation
  • sentiment analysis
  • governance approvals

Increasingly, councils are using artificial intelligence to assist with summarising responses, identifying recurring themes and detecting emerging issues. However, human judgement remains essential to interpreting complex community perspectives.

Step 6: Measure Success

Many organisations finish consultation once the report is written. High-performing organisations evaluate whether the consultation achieved its objectives.

Success measures might include:

Participation

  • Number of participants
  • Diversity of participants
  • Geographic representation

Process

  • Delivery against timeline
  • Completion of planned activities
  • Accessibility outcomes

Quality

  • Stakeholder satisfaction
  • Community trust
  • Transparency
  • Representation of affected communities

Organisational Learning

  • Lessons identified
  • Improvements implemented
  • Stakeholder knowledge retained
  • Relationships strengthened

The final category is often overlooked. Every consultation should improve the organisation’s ability to engage more effectively next time.

A consultation plan shouldn’t only guide the current project. It should contribute to the organisation’s long-term understanding of its community. Every consultation should leave the council knowing more than it did before.

Choosing the Right Consultation Methods

One of the most common misconceptions about public consultation is that there is a “best” engagement method.

There isn’t.

Every consultation method has strengths, limitations and situations where it is most effective. The challenge for councils is selecting methods that align with the project’s objectives, stakeholders and desired outcomes, not simply repeating the techniques used on previous projects.

The best consultations often combine several complementary methods, allowing different members of the community to participate in ways that suit their needs.

Online Surveys

Online surveys remain one of the most widely used consultation tools because they are easy to distribute, relatively inexpensive and capable of reaching large audiences. They work well when organisations need to understand broad community preferences or gather structured quantitative feedback.

Best suited for:

  • Strategic plans
  • Draft policies
  • Service reviews
  • Budget priorities

Strengths

  • Broad reach
  • Easy to analyse
  • Cost-effective
  • Accessible at any time

Limitations

  • Limited opportunity for discussion
  • May not reach digitally excluded groups
  • Often attracts participants with strong existing views

Public Meetings

Public meetings allow communities to hear directly from decision-makers and ask questions. While they can build transparency, they are less effective for gathering representative community views. Attendance is often dominated by highly interested stakeholders.

Best suited for:

  • Major infrastructure projects
  • High-profile community issues
  • Information sharing

Community Workshops

Workshops provide opportunities for collaborative problem solving rather than simply collecting opinions. Participants can explore trade-offs, test ideas and contribute to developing solutions. They are particularly valuable for complex or contested projects.

Pop-up Engagement

Pop-up consultation takes engagement into the community rather than expecting people to attend formal meetings.

Examples include:

  • shopping centres
  • libraries
  • sporting events
  • community festivals
  • transport hubs

Pop-ups often engage people who would otherwise never participate.

Stakeholder Interviews

One-on-one interviews provide deeper insights than surveys and are particularly useful for understanding the perspectives of key stakeholders.

They work well with:

  • business leaders
  • community organisations
  • government agencies
  • Traditional Owners
  • elected representatives

Interviews also help build stronger long-term relationships.

Community Reference Groups

Major infrastructure projects frequently establish community reference groups to provide ongoing input throughout planning and delivery. Unlike one-off consultations, these groups build continuity and trust over extended periods.

Deliberative Engagement

Some decisions benefit from more intensive participation processes such as citizens’ juries, deliberative panels or participatory budgeting. These approaches involve smaller groups of participants who are provided with balanced information, hear from experts and work together to develop recommendations. While more resource-intensive, they can produce high-quality outcomes for complex policy questions.

Digital Engagement Platforms

Digital consultation platforms are a common way councils engage with their communities. Features such as project pages, interactive maps, discussion forums and online submissions make participation more accessible and efficient than traditional paper-based processes.

These platforms are particularly effective for:

  • publishing project information
  • collecting submissions
  • running surveys
  • mapping local issues

They have become an important part of the modern engagement toolkit. However, it is important to recognise what these platforms are designed to do. They primarily support individual consultation projects. They are not designed to manage long-term stakeholder relationships across multiple projects, departments and years of engagement. This distinction becomes increasingly important as councils mature their engagement practices.

It is also interesting to note that the rising trend of councils using these platforms for citizen engagement parallels a rise in community sentiment that they are not being heard and rising distrust in engagement and the organisations who run them.

Choosing Methods Based on Purpose

Rather than asking, “Should we run a survey or a workshop?”, a better question is:

“What are we trying to achieve?”

Different objectives require different methods.

If your objective is… Suitable methods
Inform the community Website, digital engagement platform, newsletters, fact sheets, social media
Gather broad community feedback Online surveys, submissions, interactive maps
Understand complex issues Workshops, focus groups, interviews
Build relationships Stakeholder meetings, reference groups, ongoing engagement
Co-design solutions Collaborative workshops, design charrettes, deliberative panels
Reach underrepresented communities Pop-up engagement, targeted outreach, community partnerships

This reinforces an important principle explored earlier in this guide through the Capire Engagement Triangle: engagement methods should follow engagement objectives, not the other way around.

The most successful councils don’t rely on a single consultation technique. They combine methods that are appropriate for the decision, accessible to the community and capable of generating meaningful insights.

A survey is a tool. A workshop is a tool. An engagement portal is a tool. Communities don’t judge engagement by the tools you use—they judge it by whether they feel heard, respected and able to influence decisions.

What High-Quality Public Participation Looks Like

Collecting public feedback is relatively easy. Designing and delivering high-quality public participation is much harder.

For many years, organisations measured the success of consultation using operational metrics:

  • How many survey responses were received?
  • How many people attended the public meeting?
  • How many visitors viewed the project website?
  • How many submissions were lodged?

These metrics remain useful. They tell us whether people participated. They tell us very little about whether the participation was meaningful.

  • Did the consultation reach the people most affected?
  • Did participants have enough information to contribute constructively?
  • Did decision-makers genuinely consider the feedback?
  • Did the process build trust?
  • Did the organisation learn something that will improve future engagement?

These questions focus on quality, not quantity.

As governments around the world seek to rebuild public trust and improve decision-making, there is growing recognition that how organisations engage matters just as much as how often they engage.

Recent work by Simon Fraser University’s Morris J. Wosk Centre for Dialogue, developed with public participation practitioners and government organisations, argues that quality public participation should be evaluated against principles that extend far beyond simply collecting feedback. Instead, organisations should consider whether participation is inclusive, transparent, accountable, informed and responsive to community needs.

This represents an important shift in thinking.

Rather than asking:

“Did we run a consultation?”

Leading organisations increasingly ask:

“Did we create the conditions for meaningful participation?”

The Five Characteristics of High-Quality Public Participation

While every consultation is different, high-quality public participation consistently demonstrates five characteristics.

1. Accountability

Effective consultation gives people confidence that their participation has purpose.

Participants should understand:

  • why consultation is taking place
  • what decisions are open to influence
  • who will make the final decision
  • how community input will be considered
  • when decisions will be made

One of the quickest ways to undermine trust is to ask for feedback on issues that have already been decided. Communities quickly recognise when consultation is simply validating a predetermined outcome.

This is sometimes referred to as consultation theatre—engagement that creates the appearance of participation without offering a genuine opportunity to influence decisions.

The Victorian Parliament’s Inquiry into Community Consultation highlighted concerns that consultation can become a compliance exercise when engagement occurs too late or without clearly demonstrating how community input influences decisions. The inquiry recommended earlier engagement, greater transparency and stronger accountability throughout the consultation process.

High-quality participation begins with being honest about what is—and is not—open for discussion.

2. Transparency

People are more willing to participate when they understand how decisions are being made. Transparency means more than publishing information online.

It means openly explaining:

  • why consultation is occurring
  • what evidence has informed the proposal
  • what constraints exist
  • what trade-offs must be considered
  • how feedback will be analysed
  • how final decisions will be communicated

Importantly, transparency doesn’t end when consultation closes.

Participants deserve to know:

  • what the community said
  • what themes emerged
  • what changed as a result
  • why some suggestions could not be adopted
  • what happens next

Closing the feedback loop demonstrates respect for participants and significantly improves confidence in future consultations.

3. Inclusive Participation

One of the biggest challenges facing local government is ensuring consultation reflects the diversity of the communities it serves. The loudest voices are not always the most representative.

High-quality participation actively seeks to include people who might otherwise face barriers to participation, including:

  • culturally and linguistically diverse communities
  • Aboriginal and Torres Strait Islander peoples
  • young people
  • older residents
  • people living with disability
  • renters
  • shift workers
  • small business owners
  • geographically isolated communities

This often requires using multiple engagement methods rather than relying solely on online surveys or public meetings. Accessibility is becoming an increasingly important expectation of modern public participation.

Around the world, governments are introducing measures to make participation easier through digital access, multilingual communication and more inclusive engagement practices. The objective is not simply to maximise participation. It is to ensure that the people most affected by a decision have a meaningful opportunity to contribute.

4. Informed Participation

Communities can only provide meaningful input if they understand the issue being discussed. Too often, consultation asks participants to express an opinion without providing sufficient context.

High-quality participation equips people with balanced, accessible information about:

  • the problem being addressed
  • available options
  • evidence supporting the proposal
  • likely impacts
  • competing priorities
  • financial constraints
  • legislative requirements

This does not mean persuading people to support a proposal. It means ensuring they have enough information to participate constructively. Well-informed participants tend to provide more practical, solution-focused feedback, leading to better decisions for everyone.

5. Responsive Design

There is no single engagement method that works for every consultation. A community visioning exercise requires a different approach to consulting on temporary road closures.

Responsive consultation recognises that engagement should be designed around:

  • the complexity of the issue
  • stakeholder needs
  • cultural considerations
  • community preferences
  • available time
  • project risks

Measuring What Matters

Many councils already report participation statistics.

For example:

  • 3,200 survey responses
  • 14,000 website visits
  • 680 submissions
  • 12 community meetings

These are useful operational metrics. However, they do not necessarily tell us whether engagement was successful. High-quality organisations increasingly measure outcomes that reflect relationship quality and organisational learning.

Traditional Consultation Metrics

  • Number of participants
  • Survey completion rates
  • Website traffic
  • Event attendance
  • Social media engagement
  • Number of submissions

These help answer:

“How much engagement occurred?”

High-Quality Participation Metrics

Leading organisations also measure:

  • Did we reach the people most affected?
  • Were underrepresented communities included?
  • Did participants understand the issues?
  • Did stakeholders feel heard?
  • Did consultation influence decisions?
  • Were commitments fulfilled?
  • Has community trust improved?
  • What organisational learning was generated?
  • How have stakeholder relationships changed?

These questions help answer something much more valuable:

“Did engagement improve our decision-making and strengthen our relationship with the community?”

Participation is an output. Trust is an outcome.

Measuring how many people responded tells you how busy your consultation was. Measuring how relationships changed tells you whether your engagement made a lasting difference.

From Projects to Organisational Learning

One of the most overlooked outcomes of public participation is the organisational knowledge it creates.

Every consultation generates valuable information about:

  • stakeholder priorities
  • community concerns
  • emerging issues
  • influential community leaders
  • preferred communication channels
  • commitments made by council
  • relationships between stakeholders
  • changing sentiment over time

Unfortunately, this knowledge is often lost. When consultations are managed as standalone projects, stakeholder information is scattered across spreadsheets, email inboxes, survey platforms and project files. The next project begins with another stakeholder list. Another survey. Another set of introductions.

The organisation has participated in consultation—but it has not learned from it.

High-quality public participation captures knowledge once and builds on it continuously. Every interaction contributes to a richer understanding of the community. Every consultation strengthens—not resets—the relationship between council and its stakeholders.

This is one of the defining characteristics of mature community engagement organisations.

Technology Supports Quality—It Doesn’t Create It

Digital consultation platforms have improved the accessibility and efficiency of public participation. They make it easier to publish projects, collect submissions, facilitate discussions and report on consultation activities.

These are important capabilities. However, technology alone cannot create high-quality engagement.

High-quality participation depends on organisational capability, including:

  • clear governance
  • skilled practitioners
  • thoughtful consultation planning
  • strong stakeholder relationships
  • organisational memory
  • continuous improvement
  • leadership commitment to engagement

Technology should support these capabilities, not replace them.

The highest-performing councils recognise that successful engagement is not defined by the sophistication of their consultation portal. It is defined by the quality of the relationships they build with their communities and the confidence those communities have that their voices genuinely matter.

Good consultation collects feedback. Great engagement creates organisational learning.

The real value of public participation isn’t the consultation report—it’s the knowledge, trust and relationships that make every future decision better.

Trend: Participation Is Becoming More Accessible by Design

Historically, public participation often depended on residents being able to attend evening council meetings in person.

Increasingly, governments are recognising that this excludes many people, including shift workers, carers, people with disabilities and those living in remote areas. Legislation such as California’s SB 707 reflects a broader movement towards participation by design, requiring many local governments to provide remote attendance options, improve multilingual access and proactively encourage public participation.

Technology has an important role to play in making participation easier.

However, accessibility is only the beginning.

The next challenge for councils is ensuring that participation leads to stronger relationships, better organisational learning and more informed decision-making.

Common Public Consultation Mistakes (and How to Avoid Them)

Most councils don’t set out to run poor consultations. Engagement practitioners are passionate about involving communities, making better decisions and building trust.

Yet despite significant investment in engagement, many organisations still experience community opposition, declining participation, consultation fatigue and accusations that “Council never listens.”

The problem is rarely a lack of commitment. More often, it is a combination of organisational processes, fragmented information and unrealistic expectations.

The following challenges appear repeatedly across local government—not because councils don’t care about engagement, but because delivering consistent, high-quality participation across hundreds of projects is inherently difficult. Recognising these challenges is the first step towards improving them.

Mistake 1: Starting Consultation Too Late

One of the most common reasons consultations fail is that they begin after the most important decisions have already been made.

Communities generally understand that some constraints, such as budgets, legislation or engineering requirements, cannot be changed. What frustrates people is discovering that consultation is only seeking feedback on minor details after the major decisions have already been finalised.

The Victorian Parliamentary Inquiry into Community Consultation emphasised the importance of engaging communities early enough for participation to genuinely influence decisions, rather than treating consultation as the final step before implementation.

Best practice

Begin engagement when there are still meaningful choices available.

Clearly explain:

  • what can change
  • what cannot change
  • why

Communities are far more accepting of constraints when they are communicated honestly from the beginning.

Mistake 2: Confusing Consultation with Community Engagement

Running a consultation is not the same as building relationships. Many organisations invest heavily in individual consultation projects but treat each one as an isolated exercise.

When the project finishes:

  • stakeholder lists are archived
  • submissions are stored
  • reports are published

Then the next project starts from scratch. The result is repeated introductions, duplicated questions and communities feeling that previous conversations have been forgotten.

Community engagement should be cumulative. Every consultation should strengthen the organisation’s understanding of its stakeholders and improve future engagement.

Consultation is an event. Community engagement is an ongoing relationship.

Every project should build on the relationships established by the last—not begin again with a blank stakeholder register.

Mistake 3: Measuring Participation Instead of Trust

Many consultation reports celebrate statistics such as:

  • 5,200 website visits
  • 1,800 survey responses
  • 450 submissions
  • 12 community meetings

These are valuable operational measures.

But they don’t necessarily tell us whether engagement was successful.

For example:

  • Did participants feel heard?
  • Were underrepresented communities involved?
  • Did relationships improve?
  • Did community confidence increase?
  • Were commitments honoured?

Participation is easy to count. Trust is harder to measure. et trust is ultimately what determines whether communities continue participating in future consultations.

High-performing organisations increasingly measure:

  • stakeholder satisfaction
  • relationship health
  • issue resolution
  • commitment completion
  • organisational learning

Because these indicators reveal whether engagement is creating long-term value rather than simply generating activity.

Mistake 4: Consultation Theatre

One of the greatest risks facing public participation is what many practitioners describe as consultation theatre—engagement that appears genuine but offers little real opportunity to influence decisions.

Consultation theatre can occur when:

  • engagement happens after key decisions have been made
  • only preferred options are presented
  • feedback is collected but never acknowledged
  • consultation fulfils statutory requirements without informing decision-making
  • communities never hear what happened to their input

The result is often worse than no consultation at all. Communities begin to lose confidence that participation makes any difference. Participation rates decline. Opposition becomes more organised. Future consultations become more difficult.

The Victorian Parliamentary Inquiry highlighted the importance of demonstrating how community input influences decisions and ensuring consultation is integrated into decision-making rather than treated as a compliance exercise.

Good consultation is not measured by whether everyone agrees with the outcome. It is measured by whether people believe the process was fair.

Mistake 5: Relying on One Engagement Method

Every community is different. Every project is different. Yet many organisations rely heavily on a single engagement approach.

For example:

  • publishing an online survey
  • creating a project in a digital consultation site
  • sending a newsletter

Each of these methods reaches different people. None reaches everyone. Younger residents may respond online. Older residents may prefer face-to-face conversations. Businesses may request one-on-one briefings. Community organisations may benefit from workshops.

Effective consultation combines multiple engagement methods to ensure diverse voices can participate. The objective should not be maximum efficiency. It should be meaningful inclusion.

Mistake 6: Losing Organisational Memory

Valuable knowledge disappears every time staff roles change, projects finish, consultants leave or systems are replaced. This is not simply frustrating for the community. It is inefficient for the organisation. The organisation continually rebuilds knowledge it once possessed.

Mistake 7: Working in Departmental Silos

Most councils don’t have one engagement team. They have dozens of teams engaging stakeholders every day. Planning, engineering, parks, waste, libraries, economic development, community services, are all engaging with the same community. And each department creates and manages it own stakeholder lists, consultation records and reporting processes.

Residents, however, don’t experience “departments.” They experience one council.

When information isn’t shared internally, communities often receive:

  • conflicting messages
  • repeated requests for information
  • duplicated consultation
  • inconsistent follow-up

Breaking down these silos is one of the hallmarks of mature community engagement organisations.

Mistake 8: Treating Technology as the Solution

But technology cannot compensate for unclear objectives, weak governance or poor engagement practices.

An online engagement platform cannot decide:

  • whether the right stakeholders have been identified
  • whether engagement started early enough
  • whether commitments have been honoured
  • whether trust is improving
  • whether relationships are becoming stronger

Technology supports engagement. It does not replace good engagement.

The highest-performing organisations invest as much in people, governance and organisational learning as they do in software.

The Common Thread

Although these mistakes appear different, they usually stem from the same underlying issue.

The organisation treats consultation as a series of individual projects rather than as an ongoing organisational capability. Each consultation becomes a separate event. Knowledge is lost. Relationships weaken. Trust must be rebuilt.

Mature organisations think differently. Every consultation contributes to a growing understanding of their community. Every interaction strengthens organisational knowledge. Every project builds on the last.

That shift—from managing consultations to managing stakeholder relationships—is one of the defining characteristics of leading community engagement organisations.

What’s Next?

Understanding these common mistakes naturally leads to an important question:

What role should technology play?

Many councils have invested in online consultation platforms to support community participation. These platforms are valuable, but they represent only one part of the engagement ecosystem.

In the next chapter, we’ll explore the difference between consultation platforms and Stakeholder Relationship Management software, and why an increasing number of councils are using both to move beyond project-based consultation towards long-term stakeholder intelligence.

Consultation Platforms and Stakeholder Relationship Management Software

Over the last decade or two, digital consultation platforms have changed the way councils engage with their communities. Project websites, online polls, map based feedback, discussion forums, budgeting tools, have all made public participation more accessible (to people who have access to the technology and the digital literacy to participate). Despite their limitations of relatively low participation rates, and inaccessibility to sections of the community, they have brought many benefits to the practice of public participation and consultation, especially in terms of efficiency.

However, as councils have become more sophisticated in their engagement practices, many have discovered that running project level consultations efficiently and managing stakeholder relationships effectively are two different challenges. One focuses on individual public consultation projects, The other focuses on long-term organisational relationships. Understanding the distinction between these becomes important as councils seek to build community trust over years, not just deliver successful consultation projects.

Consultation Platforms Are Designed for Individual Engagement Processes

Consultation platforms are purpose-built to support public participation during a specific consultation.

Typical capabilities include:

  • publishing project information
  • online polls
  • interactive maps
  • discussion forums
  • document libraries
  • map based feedback collection
  • consultation reporting

These capabilities make public consultation significantly easier to manage.

For many councils, they have replaced paper surveys, manual submissions and static project webpages.

They answer questions such as:

  • How many people participated?
  • What feedback did we receive?
  • Which ideas were most popular?
  • What themes emerged during this consultation?

These are valuable insights.

But they primarily relate to this consultation. And in some ways, these tools compound the “memory problem” described earlier, where each project starts from scratch and communities are asked the same questions over and over again.

Stakeholder Relationship Management Software Is Designed for Organisational Memory

Stakeholder Relationship Management (SRM) software like Simply Stakeholders solves a different problem.

Rather than managing a public consultation project, it manages the organisation’s relationships with stakeholders across every project and every department.

Instead of asking:

“What happened during this consultation?”

SRM asks:

“What do we know about this stakeholder after five years of working together?”

Typical capabilities include:

  • organisation-wide stakeholder register
  • complete interaction history
  • stakeholder mapping
  • relationship mapping
  • issue management
  • commitment tracking
  • meeting records
  • correspondence
  • relationship ownership
  • AI-generated stakeholder insights
  • executive reporting

This information continues accumulating long after individual consultations have closed. The organisation develops an increasingly rich understanding of its community.

Comparing the Two Approaches

 

Digital Public Consultation Platforms Stakeholder Relationship Management Software
Supports individual consultation projects Supports long-term stakeholder relationships
Publishes project information Maintains organisation-wide stakeholder knowledge
Collects online feedback Records every interaction – online and in-person
Information is kept at an individual project level Stakeholder relationship history
Basic issues tracking Issue management across all channels of engagement
Basic sentiment assessment of some types of feedback Sentiment tracking over multiple channels, multiple projects, over the long term
Consultation reporting Cross-project reporting
Project-focused Relationship-focused
Consultation ends when the project finishes Relationships continue across multiple years and projects

Neither approach replaces the other. They solve different problems.

Why Leading Councils Increasingly Use Both

The most mature organisations increasingly view digital public consultation platforms and Stakeholder Relationship Management software as complementary.

A consultation platform helps deliver an effective consultation.

A Stakeholder Relationship Management platform ensures that knowledge generated during that consultation becomes part of the organisation’s long-term understanding of its community.

For example:

A resident submits feedback on a cycling strategy. The public consultation platform records the submission and provides information on the project.

The Stakeholder Relationship Management platform records:

  • who the stakeholder is
  • previous consultations they’ve participated in
  • meetings they’ve attended
  • issues they’ve raised
  • commitments made to them
  • relationships with local community groups
  • communication preferences
  • ongoing engagement history

The public consultation becomes part of a much larger relationship.

Consultation platforms collect community input. Stakeholder Relationship Management preserves community knowledge.

One improves individual projects. The other improves every future project.

Beyond Public Consultation: Building Stakeholder Intelligence

The greatest value of stakeholder information isn’t simply storing it. It’s learning from it. As organisations capture years of stakeholder interactions, they begin identifying patterns that would never be visible within a single consultation.

For example:

  • Which communities consistently participate?
  • Which important stakeholder groups rarely engage?
  • Which issues repeatedly emerge across different projects?
  • Which commitments remain outstanding?
  • Which relationships are becoming stronger?
  • Where is community trust improving—or declining?

This is where stakeholder management evolves into Stakeholder Intelligence.

Rather than simply recording engagement activities, councils begin generating insights that support better strategic decision-making. Artificial intelligence is accelerating this transition.

Modern platforms can increasingly help organisations:

  • identify emerging issues
  • summarise engagement activity
  • detect recurring concerns
  • analyse stakeholder sentiment
  • highlight relationship risks
  • recommend follow-up actions

The value no longer lies only in collecting data. It lies in converting engagement data into organisational intelligence.

Every Consultation Should Strengthen the Next One

One of the defining characteristics of mature engagement organisations is that every public consultation leaves them better prepared for the next.

Instead of creating another isolated project file, each consultation contributes to a growing body of organisational knowledge. Stakeholders don’t have to repeat their history. Commitments aren’t forgotten. Relationships continue developing regardless of staff changes or project boundaries. The organisation becomes progressively better at listening, learning and responding.

This is the transition described earlier in the Community Engagement Maturity Model:

  • From Publish
  • To Consult
  • To Engage
  • To Understand
  • To Predict

Online public consultation platforms play an important role in that journey. But they represent only one part of a broader organisational capability. The organisations building the strongest community relationships are those that connect consultation with long-term stakeholder management, organisational learning and stakeholder intelligence.

The future of community engagement isn’t running more consultations.

It’s ensuring every public consultation makes the next one smarter.

Infographic showing the four levels of community engagement technology

Looking Ahead

Public consultation continues to evolve. Communities expect engagement to be earlier, more inclusive, more transparent and more responsive than ever before. At the same time, advances in AI, analytics and stakeholder intelligence are changing what organisations can learn from every interaction.

 

Ready to strengthen your public consultation?
Simply Stakeholders helps Councils and other government agencies build their stakeholder intelligence through stakeholder relationship management, creating one source of truth of all public consultation, community engagement and stakeholder engagement activities.Request a personalised demo at simplystakeholders.com or contact our team to discuss how we can support your public consultation efforts.

]]>
Guide to Effective Submission Management https://simplystakeholders.com/resources/guides/submissions-management/ Thu, 05 Mar 2026 01:40:07 +0000 https://simplystakeholders.com/?post_type=guide&p=4437

When organisations invite feedback or formal submissions on complex documents, such as draft strategies, planning proposals, policy frameworks, legislative amendments, or major project plans, they face a fundamental challenge: how do they gather responses that are structured enough to analyse at scale, while still capturing the depth of expert or community input that the subject matter demands? And how to make this submissions management process efficient, equitable and defensible?

Let’s start with the definiton of what submissions and a formal submissions management process actually entails….

What is Submission Management?

The terms ‘submissions management process’ and ‘submissions analysis process’ describe two interconnected but distinct stages in the broader practice of public and stakeholder consultation. These processes are central to democratic governance, evidence-based policymaking, and regulatory legitimacy across the world’s major democracies. Despite sharing a common conceptual foundation, they are named, structured, and given different legal weight in different jurisdictions.

What Is a Submission?

A submission is a formal written response from an individual, organisation, group or institution, made in reply to a documented invitation to provide comment or feedback on a proposed policy, regulatory instrument, plan, strategy, environmental assessment, legislative amendment, or other formal document that is open for public or stakeholder consultation.

Three elements distinguish a submission from informal feedback:

  1. There is an authorising document, a green paper, white paper, consultation paper, discussion draft, exposure draft, proposed project plan, or notice of proposed rulemaking, that establishes the subject matter on which comment is invited.
  2. There is a defined process, including a specified submission period with a closing date, a stated authority receiving submissions, and usually some guidance on scope.
  3. The submission carries some form of public record status: it is created with the intention that it will be considered by a decision-making authority and, in most jurisdictions, made available to the public.

Submissions may be made by a wide range of parties: private citizens, community organisations, industry associations, peak bodies, professional bodies, academic institutions, research organisations, government agencies, and elected representatives. They may be brief or extensive, technical or general, individual or coordinated. Their common feature is that they are addressed to a specific authority on a specific consultation, in response to a specific set of questions or an invitation to comment on specific proposals.

Distinguished from comments: In some jurisdictions, particularly the United States, the word ‘comment’ is preferred to ‘submission’ in regulatory contexts. In others such as Australia and the UK, ‘submission’ is the standard term for formal responses to parliamentary inquiries and policy consultations, while ‘comment’ may describe shorter, less formal online responses. This guide uses ‘submission’ as the primary term but acknowledges its equivalents across jurisdictions.

What is a Submissions Management Process?

The submissions management process is the end-to-end administrative and procedural framework through which a consultation authority or organisation:

(a) invites submissions from the public and other stakeholder groups;
(b) facilitates the receipt of those submissions;
(c) maintains an accessible record of them; and
(d) closes the submission period and transitions to analysis.

It encompasses both the public-facing activities (advertising the consultation, publishing the consultation document, providing guidance to would-be submitters) and the administrative management activities (receiving and registering submissions, managing confidentiality requests, and organising submissions for analysis).

A well-designed submissions process has six defining characteristics:

  1. Transparency: the process is publicly announced, the consultation document is publicly accessible, and the authority’s identity and mandate are clear
  2. Accessibility: the process is designed to enable participation by the full range of relevant parties, including those with limited resources or technical knowledge
  3. Defined scope: the subject matter on which comment is invited is clearly described, so that submissions can be directed and relevant
  4. Defined timeline: a clear submission period with an opening date, closing date, and, where applicable, an extension mechanism
  5. Acknowledgement and record-keeping: submissions are acknowledged on receipt, assigned a reference number, and entered into a register that constitutes the evidentiary basis for analysis
  6. Procedural integrity: the process is conducted in accordance with any applicable legislative, regulatory, or policy requirements governing the consultation authority

What is a Submissions Analysis Process?

The submissions analysis process is the structured methodology by which a consultation authority systematically reads, categorises, interprets, and reports on the body of submissions received in response to a consultation. Its purpose is to transform a collection of individual responses, ranging from brief expressions of support or concern to lengthy technical reports, into an evidence base that can inform decision-making.

The submissions analysis process is not a passive or mechanical exercise. It requires substantive analytical judgement about how to interpret and characterise submissions, how to weight different types of evidence, and how to fairly represent the range of views expressed. It also requires procedural rigour: the methodology must be transparent, consistent, and defensible to withstand scrutiny from submitters, Parliament or legislatures, courts, and the public.

At its core, the submissions analysis process answers four questions:

  • What did submitters say?  the descriptive layer of analysis, identifying the themes, arguments, evidence, and views expressed
  • Who said it?  the classificatory layer, identifying which stakeholder groups or types of respondents expressed particular views
  • How significant is it?  the evaluative layer, assessing the weight and quality of the evidence presented and the representativeness of the views expressed
  • What does it mean for the decision?  the interpretive layer, translating the findings into insights that can inform the recommendations or decisions that flow from the consultation

These four layers map onto the distinction between qualitative analysis (what was said and why it matters) and quantitative summary (how many said it). Both are necessary, but neither is sufficient on its own. A rigorous submissions analysis process integrates both and is transparent about the methodology used at each layer.

The submissions management process and the submissions analysis process are sequential but deeply interdependent. The design of the submissions process determines the quality and analysability of the data the analysis process will have to work with. If the submissions process uses an unstructured format, simply inviting free-text responses without prompting respondents to address specific questions, the analysis process must invest heavily in initial categorisation before any substantive analysis can begin. If the submissions process uses a structured questionnaire with defined questions, the analysis process can proceed directly to coding and interpretation.

Equally, the intended outputs of the analysis process should shape the design of the submissions process. If the authority knows it will need to disaggregate responses by stakeholder type, the submissions process must capture stakeholder classification data. If it knows it will need to quantify support for or opposition to specific proposals, the submissions process should include scaled or preference questions that yield quantifiable data. The submissions process and analysis methodology should therefore be designed together, not sequentially.

Two Common Approaches For Submissions Management

Two common approaches are online engagement platforms (such as Granicus, Social Point, Tractivity) and structured questionnaires or surveys. While engagement platforms excel at broad community consultation and awareness-raising, a well-designed structured questionnaire is almost always the superior choice when the goal is to collect and analyse substantive feedback on complex documents or topics. This guide explains why, and provides practical guidance for designing, administering, and analysing questionnaire-based submissions.

Online Engagement Platforms

Platforms such as Granicus (formerly GovDelivery and Bang the Table), Social Point (formerly Social Pinpoint), and Engagement HQ are purpose-built community engagement tools. They typically offer features such as interactive maps, idea boards, polls, discussion forums, comment walls, and story submissions. Their strengths lie in:

  • Reaching broad, non-specialist audiences
  • Generating awareness and publicising a consultation
  • Facilitating informal, low-barrier participation
  • Displaying real-time participation metrics and heat maps
  • Hosting supporting materials like videos, FAQs, and documents alongside engagement activities

However, these strengths come with significant limitations when the subject matter is complex. Open comment walls and idea boards produce unstructured text that is difficult to categorise and compare systematically. The comments are usual short and ‘surface level’ or polarized positions, as the format itself does not encourage deeper deliberation. Polling features reduce nuanced positions to simple votes. The informal tone encouraged by these platforms is often poorly suited to professional stakeholders, such as industry groups, peak bodies, and subject matter experts, who need to make detailed, referenced submissions. Critically, engagement platforms do not ensure that respondents engage with the actual content of the document being reviewed.

Learn more: What Does Stakeholder Mean?

Structured Questionnaires

A structured questionnaire is a document or online form presenting a defined series of questions, including both closed (scaled or multiple choice) and open (free-text) questions, that directly map to the sections, proposals, or issues within the complex document under review. When well designed, a structured questionnaire:

  • Guides respondents through the document in a logical sequence
  • Ensures every submission addresses the same set of questions, enabling direct comparison
  • Captures both quantitative sentiment data (agreement scales, ratings) and qualitative reasoning
  • Provides a defensible and transparent analytical framework
  • Is suitable for expert and professional stakeholders as well as general community members
  • Produces data that can be systematically coded, tabulated, and reported

Why Structured Questionnaires Are More Suitable for Complex Documents

Ensures Substantive Engagement with the Content

Online engagement platforms present a persistent risk: participants may engage with the platform’s interactive features (placing pins, voting in polls, posting comments) without ever reading the underlying document. A structured questionnaire, particularly one that references specific sections, proposals, or criteria within the document, requires respondents to engage substantively with the material in order to answer meaningfully. This produces higher-quality submissions and a more reliable evidence base for decision-making.

Enables Systematic Comparative Analysis

When hundreds or thousands of submissions are received, the ability to compare responses across respondents is critical. Engagement platform comments are difficult to compare because respondents write to different prompts, at different lengths, on different topics. A questionnaire ensures every respondent addresses the same questions, meaning their responses can be directly tabulated, coded, and compared. Agreement-scale questions can be graphed and statistically summarised. Open-text responses to the same prompt can be thematically coded together.

Supports Proportionate Weighting and Disaggregation

Complex consultations frequently involve multiple distinct stakeholder groups, for example, industry proponents, environmental advocates, government agencies, and general community members, whose views may differ significantly and who may need to be reported on separately. A questionnaire can capture demographic and stakeholder classification data upfront, allowing analysis teams to disaggregate results by group and apply appropriate weighting. Engagement platform submissions are rarely structured in a way that makes such disaggregation straightforward.

Provides a Defensible and Auditable Process

For consultations with regulatory, legal, or political significance, the consultation process itself may be scrutinised. A structured questionnaire in your submissions management process provides a clear, documented record of what was asked, in what order, and what responses were received. This audit trail supports transparent reporting and reduces the risk of the consultation being challenged on procedural grounds. Engagement platforms, with their mix of comments, reactions, and informal interactions, can be more difficult to defend as a rigorous process.

Accommodates Professional and Expert Respondents

Many complex documents require input from professional stakeholders: engineers, lawyers, planners, scientists, industry representatives, and government officials. These respondents typically expect a formal submission process. A structured questionnaire, particularly one made available as a downloadable document as well as an online form, meets professional expectations in a way that a social-media-style engagement platform does not. It signals that the organisation takes the consultation seriously and values the expertise of respondents.

Reduces Analysis Burden

Perhaps the most practical advantage is the reduction in post-submission analysis effort. Open-ended comments on an engagement platform require extensive manual reading, sorting, and categorisation before any analysis can begin. A questionnaire structures this work upfront: closed questions are pre-formatted for quantitative summary, and open questions are already grouped by topic. This makes it feasible to process large submission volumes within realistic timeframes and budgets.

At a Glance: When to Choose a Questionnaire Over an Engagement Platform for Effective Submissions Management
•  The feedback object is a specific document, plan, or proposal with defined content
•  Responses need to be compared, aggregated, or statistically summarised
•  Professional, expert, or industry stakeholders are key participants
•  The process may be subject to legal, regulatory, or political scrutiny
•  Resources for manual analysis of unstructured responses are limited
•  Disaggregation of results by stakeholder type is required

Best Practice Questionnaire Design

Start with Clear Objectives

Before writing a single question, clearly articulate what decisions or outcomes the feedback will inform. Are you testing support for a specific policy option? Identifying concerns about a technical proposal? Gathering evidence for a regulatory impact assessment? Each question in the questionnaire should serve one or more of these objectives. Questions that do not connect to a specific decision or output should be removed.

Mirror the Structure of the Document

Organise the questionnaire to follow the structure of the document being reviewed. If the document has five chapters or sections, the questionnaire should have five corresponding sections. This helps respondents locate relevant passages as they work through the questionnaire and makes it easier to map responses back to specific parts of the document in the analysis phase. Include section references (e.g., “The following questions relate to Section 3: Proposed Zoning Changes”) to orient respondents.

Use a Mix of Question Types Purposefully

Effective questionnaires for complex documents combine several question types, each serving a distinct analytical purpose:

Agreement/Rating Scales

Likert-type scales (e.g., Strongly Agree — Agree — Neither — Disagree — Strongly Disagree) are ideal for measuring the level of support for specific proposals, values, or principles. Use a consistent scale throughout the questionnaire and always include a “Don’t know / No view” option for questions where respondents may genuinely lack a basis for a view. Five-point scales are generally preferred for capturing nuance without overwhelming respondents.

Multiple Choice and Ranking Questions

Use these to identify preferred options from a defined list, or to rank priorities. These are particularly useful when a document presents multiple alternative approaches and you need to understand relative preference. Ensure the options presented are exhaustive and mutually exclusive, and always include an “Other (please specify)” option to capture positions outside the defined list.

Open-Text Questions

Open-text questions are essential for capturing the reasoning, evidence, and nuance behind rated responses. Every significant rating or preference question should be followed by an open-text prompt: “Please provide any comments or reasons for your response above.” Open-text questions should also be used to invite respondents to raise issues, identify risks, or suggest alternatives that the questionnaire may not have anticipated. Avoid making open-text questions mandatory, this discourages completion, but clearly communicate their value.

Factual and Demographic Questions

Include questions to capture the respondent’s stakeholder category, professional background, geographic location, and any other classification variables that will be needed for disaggregation in the analysis. These are best placed at the beginning of the questionnaire (before fatigue sets in) or at the very end, with a brief explanation of why the information is being collected.

Write Clear, Unbiased Questions

Question wording has a profound effect on response quality. Follow these principles:

  • Use plain language. Avoid jargon, acronyms, and technical terms that may not be understood by all respondents. If technical terms are unavoidable, provide brief definitions.
  • Ask one thing at a time. Avoid double-barrelled questions (“Do you agree with the proposal’s objectives and its implementation approach?”). Each question should test a single proposition.
  • Avoid leading questions. Phrasing such as “Do you agree that the proposed increase in green space will benefit the community?” signals the expected answer. Use neutral framing: “To what extent do you support the proposed increase in green space?”
  • Avoid loaded or emotive language. Words like “controversial”, “radical”, or “excessive” introduce bias. Describe proposals factually.
  • Ensure answer options are exhaustive and balanced. If using a scale, ensure it is symmetric, the same number of positive and negative response options.

Manage Length and Cognitive Load

Respondent fatigue is a significant risk in complex document consultations, where the subject matter is already demanding. To manage length:

  • Limit the total number of questions to what is strictly necessary. As a rough guide, aim for no more than 40–50 questions for a highly complex document, and considerably fewer for shorter documents.
  • Group related questions under clear section headings with brief introductory text.
  • Use skip logic (branching) to show only relevant questions to each respondent. For example, questions about a specific technical proposal may only be relevant to industry stakeholders.
  • Provide an estimated completion time at the start of the questionnaire.
  • In online formats, show a progress indicator so respondents can gauge how much remains.

Make the Questionnaire Accessible

Accessibility is both an ethical obligation and a practical necessity for reaching a diverse respondent pool:

  • Provide the questionnaire in multiple formats: an online form and a downloadable document (Word and/or PDF) that can be completed and returned by email for respondents who prefer or require this.
  • Ensure online forms comply with WCAG 2.1 accessibility guidelines (sufficient colour contrast, keyboard navigation, screen reader compatibility).
  • Offer assistance for respondents who need help completing the questionnaire (e.g., a contact phone number or email).
  • Provide clear instructions for how to complete and submit the form. Include details of other ways to submit (for example print and email the form as well as submitting online)
  • Translate the questionnaire for non-English speaking communities if the subject matter is likely to affect them.

Pilot Test Before Launch

Always pilot test the questionnaire before releasing it publicly. Recruit a small group of internal and external testers representing different stakeholder types. Ask them to complete the questionnaire and provide feedback on clarity, length, technical issues, and any questions they found confusing or ambiguous. Pilot testing consistently identifies problems that are invisible to the people who wrote the questions.

Questionnaire Design Checklist

•  Objectives clearly defined and each question mapped to an objective
•  Structure mirrors the document being reviewed
•  Mix of scaled, multiple choice, and open-text questions
•  Questions are single-barrelled, neutral, and in plain language
•  Answer options are exhaustive, balanced, and include ‘Don’t know’ where appropriate
•  Total question count reviewed for necessity and manageability
•  Skip logic applied to route respondents to relevant sections
•  Demographic/stakeholder classification questions included
•  Multiple submission formats available (online, Word, PDF)
•  Accessibility requirements met
•  Pilot test completed and feedback incorporated

Key Considerations for Analysing Submissions

 Establishing an Analysis Framework Before Data Collection

The analysis framework should be developed before the questionnaire is finalised, ideally at the same time as the questions are being written. The framework should specify: what outputs are required (e.g., a summary report, a detailed submission register, a cabinet briefing), what level of disaggregation is needed, what decisions the analysis will inform, and what analytical methods will be applied to closed and open questions respectively. Building the framework before data collection prevents the common problem of realising mid-analysis that critical classification variables were not captured.

Quantitative Analysis of Closed Questions

Closed questions (rating scales, multiple choice, ranking) lend themselves to straightforward quantitative summary. The key outputs typically include:

  • Frequency distributions showing the number and percentage of respondents selecting each response option
  • Mean scores and measures of spread for rating scale questions
  • Cross-tabulations showing how responses differ across stakeholder groups, geographic areas, or other classification variables
  • Statistical tests of significance where sample sizes permit and where testing group differences is analytically important

Be transparent about sample sizes and response rates when reporting quantitative results. A result showing that 70% of respondents support a proposal means something very different if it is based on 15 responses versus 1,500. Also note the non-random nature of most consultation samples: respondents self-select, meaning results should not be extrapolated as representative of broader population views.

Qualitative Analysis of Open-Text Responses

Open-text responses are often the most analytically valuable part of a questionnaire-based consultation, providing the reasoning, evidence, and contextual knowledge that closed questions cannot capture. However, they also require the most analytical skill and effort. The following approaches represent current best practice.

Thematic Coding

Thematic coding is the foundational method for analysing open-text responses. It involves reading through responses and assigning each response (or relevant portion of a response) one or more codes that describe its content. Codes are grouped into themes, higher-order categories that represent distinct types of feedback. For example, responses about traffic impacts, noise, and dust might all be coded under a “Construction Impacts” theme, while responses about economic benefits, job creation, and supply chain effects might be grouped under “Economic Outcomes”.

Develop the initial coding framework based on the structure of the questionnaire and the document, then refine it as coding progresses, adding new codes as novel themes emerge. Use a codebook to document each code’s definition and inclusion/exclusion criteria, ensuring consistency across coders. For large submission volumes, divide coding between multiple analysts and conduct inter-rater reliability checks (comparing codes assigned by different coders to the same responses) to ensure consistency.

Sentiment Analysis Within Themes

For each identified theme, record not just what respondents said but their evaluative stance: is the comment broadly positive (supportive), negative (concerned or opposed), neutral (informational or factual), or mixed? This allows reporting to convey both the substance of feedback and its directional character, for example, “The majority of comments on traffic management expressed concern, particularly regarding peak-hour congestion near the proposed access road.”

Identifying Representative and Outlier Responses

Select a set of verbatim quotes that best illustrate each major theme. Choose quotes that are representative of the mainstream view within that theme, but also note and document outlier responses, views that are held by a small number of respondents but represent a distinct and important perspective. Outliers are often particularly important in professional and expert consultations, as a single well-reasoned submission from a subject matter expert may warrant more consideration than many brief responses expressing a similar general view.

Noting the Weight of Evidence vs. Volume of Responses

A crucial and often misunderstood principle of qualitative consultation analysis is that the number of submissions expressing a particular view does not, on its own, determine the weight that view should carry in decision-making. A well-evidenced, technically detailed submission from a specialist may deserve more analytical weight than fifty brief form responses expressing the same general opinion. Equally, an organised campaign that generates large numbers of identical or near-identical responses should be identified as such and reported transparently, rather than being counted as independent evidence. Analysis reports should be explicit about these distinctions.

Handling Organised Campaigns and Form Letters

Consultations on high-profile topics frequently attract coordinated campaigns in which large numbers of people submit identical or near-identical responses, often facilitated by advocacy organisations. These should be identified through comparison of response text and reported separately from independent submissions. The existence of a campaign is itself analytically relevant, it demonstrates the mobilisation capacity of particular groups and may indicate the salience of an issue, but it should not be presented in a way that artificially inflates the apparent breadth of independent concern.

Using Software to Support Qualitative Analysis

For large volumes of open-text responses, qualitative data analysis software (QDAS) can significantly improve efficiency and rigour. Tools such as NVivo, ATLAS.ti, Dedoose, and MAXQDA support the management of large text datasets, systematic application of codes, retrieval of coded segments, and generation of summary reports. However these tools are very complex to use as they were primarily designed for an academic context. For more more real-world application, Simply Stakeholders provides the ideal mix of rigour and ease-of-use, with built in AI-assist for analysing issues, sentiment and triggering response workflows. For very large datasets, natural language processing (NLP) tools can assist with initial categorisation and sentiment analysis, though human review and validation of algorithmically generated codes remains essential for accuracy and defensibility.

Integrating Quantitative and Qualitative Findings

The strongest analysis reports integrate quantitative and qualitative findings to tell a coherent story about the range and nature of feedback received. Quantitative data provides the headline picture (“Three-quarters of respondents supported the proposed rezoning”), while qualitative data provides depth and nuance (“However, a substantial minority raised concerns about the adequacy of infrastructure to support increased density, with several engineering and planning professionals providing detailed technical arguments for a staged approach”). Neither type of data is sufficient on its own for complex document consultations.

Documenting and Reporting Analysis Transparently

Analysis reports should document the methodology clearly enough that a reader could understand and evaluate how conclusions were reached. This includes: the total number of submissions received, the breakdown by stakeholder type, the response rate (if the questionnaire was sent to a defined population), a description of the coding approach and who conducted the analysis, acknowledgement of any limitations or potential biases in the sample, and clear attribution of quantitative data to specific questions. Providing a full submission register (anonymised where appropriate) as an appendix is good practice and supports the transparency of the process.

Qualitative Analysis: Key Principles
•  Develop a codebook before coding begins and maintain it throughout
•  Use inter-rater reliability checks when multiple coders are involved
•  Distinguish between volume of responses and weight of evidence
•  Identify and separately report organised campaign responses
•  Select representative verbatim quotes to illustrate each major theme
•  Document methodology in the analysis report for transparency and auditability
•  Integrate quantitative and qualitative findings into a coherent narrative

Case Studies: Success and Failure in Submission Management

The following case studies illustrate how the quality of submission processes and analysis can shape, and sometimes distort, decision-making on complex projects and policies. They are drawn from publicly documented consultations and are intended to highlight both good practice and cautionary lessons. Where specific organisations or processes are referenced, these are based on publicly reported accounts.

Success: Infrastructure Analysis Saves a Major Transport Project

CASE STUDY Infrastructure submission analysis leads to important design refinements
Outcome: Structured analysis surfaces critical engineering concerns — design revised before construction

A state government infrastructure agency conducted a structured questionnaire-based consultation on the environmental impact statement (EIS) for a major urban rail extension. The agency received over 340 submissions, with a mix of responses from engineering consultancies, local councils, community groups, and individual residents.

Because the questionnaire was structured around the EIS chapters, the analysis team was able to systematically code open-text responses by topic area. During qualitative coding of responses to questions about the tunnelling methodology, two independent submissions from geotechnical engineering firms raised substantively similar concerns about the proposed tunnelling approach in a particular geological zone. Neither organisation was aware of the other’s submission.

The analysis report flagged this convergence explicitly, noting that while only two submissions raised the issue, both came from credentialed specialists and their technical arguments were internally consistent and specific. The project team commissioned an independent geotechnical review. The review confirmed the concerns were valid. The tunnelling methodology was revised at the design development stage, avoiding a potentially costly mid-construction change order.

Key lesson: A structured questionnaire with clear section mapping allowed the analysis team to surface low-volume but high-weight expert feedback that would have been easily overlooked in an unstructured submission process. The analytical discipline of distinguishing weight of evidence from volume of response was central to the outcome.

Success: Community Feedback Overturn of a Planning Decision

CASE STUDY Structured feedback reveals systematic miscalculation in traffic modelling
Outcome: Planning approval conditions revised; traffic model corrected following structured submissions

A local government authority (LGA) released a draft planning scheme amendment to allow a large format retail development on the urban fringe. The authority used a structured submission form asking respondents to address specific criteria, including traffic and access impacts, amenity effects, and consistency with the strategic plan.

The submission form required respondents to cite relevant sections of the draft amendment when commenting on traffic. This design choice proved consequential: multiple respondents, including a transport planning consultancy, a local residents association, and a neighbouring business, all independently cited the same traffic volume figures from the draft, identifying what they characterised as a significant underestimate in peak-hour modelling.

Because the questionnaire had grouped these responses under a common question about traffic impacts, the analysis team was able to identify that seven submissions, across three different stakeholder types, were all pointing to the same specific paragraph of the traffic assessment. The analysis report made this explicit, and the planning panel ordered a review of the traffic modelling. The independent review found the modelling had used background traffic growth rates that were outdated by several years.

The authority revised its conditions of approval to require infrastructure upgrades prior to the development proceeding, and the applicant was required to fund additional intersection works. The revised approval was upheld on subsequent review.

Key lesson: Questionnaire structure that anchored responses to specific document sections enabled pattern recognition across submissions, turning isolated concerns into a convergent evidentiary signal that demanded a response.

Failure: Poor Analysis Process Leads to a Flawed Decision — and a Legal Challenge

CASE STUDY Unstructured submissions management process produces misleading analysis — decision later overturned
Outcome: Judicial review finds consultation process inadequate; decision quashed and process repeated

A government agency released a draft policy framework for public comment using only an open submission format, essentially a free-text email box with no structured questions. Over 1,200 submissions were received across a four-week period. The agency’s analysis team, under significant time pressure, produced a summary report that characterised the responses as “broadly supportive” of the framework, noting that the majority of submissions did not raise objections.

However, the absence of a structured questionnaire meant the agency had no way to reliably determine whether those non-objecting submissions had actually read or engaged with the substantive proposals in the framework. Post-publication analysis of the raw submissions by an affected industry group revealed that a significant proportion of the apparent support came from a coordinated email campaign, in which participants had been directed to submit brief messages of support without engaging with the policy content. The analysis team had not identified or disclosed this campaign in its report.

Separately, a number of technically detailed submissions from specialist practitioners, raising specific concerns about the framework’s implementation provisions, had been categorised under a generic “concerns raised” heading without their substantive arguments being reported. Decision-makers were unaware of the specific technical objections.

The affected industry group brought a judicial review challenge on procedural fairness grounds. The court found that the consultation process had not adequately gathered or reported substantive feedback, and that the analysis report had materially misrepresented the nature of the submission base by failing to distinguish campaign responses from independent expert submissions. The decision was quashed and the consultation process ordered to be repeated using a more rigorous structured approach.

Key lesson: The absence of a fit-for-purpose stakeholder relationship management system made it impossible to ensure quality engagement, detect campaigns, or systematically report on substantive qualitative feedback. The resulting analysis was legally indefensible. This case underlines why process design, campaign identification, and transparent reporting methodology are not optional refinements, they are the foundation of a legally and procedurally sound consultation.

Failure: Volume Mistaken for Consensus — Poor Outcome for a Community

CASE STUDY Organised campaign responses misread as community consensus; decision reversed after implementation
Outcome: Policy implemented based on flawed analysis; reversed following community backlash and independent review

A public utility consulted on proposed changes to its residential service pricing structure using an online engagement platform. The platform’s built-in polling function showed that approximately 78% of respondents “supported” the new pricing model. The utility’s consultation report cited this figure prominently and used it to justify proceeding with the changes.

What the report did not disclose was that the platform had been linked to from the websites of two industry peak bodies representing large commercial customers, who stood to benefit from the residential pricing changes through cross-subsidy effects. The majority of “supportive” responses were brief, single-click poll responses that had not engaged with the explanatory material about the pricing methodology.

A subsequent independent review commissioned after community complaints found that fewer than 12% of poll respondents had clicked through to read the detailed pricing methodology document, the core of what was being consulted on. Among the smaller cohort of respondents who had submitted detailed text comments (many of whom were residential customers), opposition to the changes was overwhelming, with the most common concern being the regressive impact on low-income households.

The utility had not used a structured questionnaire and had not asked any questions that would have captured respondents’ understanding of the proposal or their household income profile. The analysis had reported aggregate poll figures without disaggregating by respondent type or engagement depth.

The pricing changes were partially reversed eighteen months after implementation following an ombudsman investigation. The utility was required to conduct a fresh consultation using a structured questionnaire approach with mandatory respondent classification questions.

Key lesson: Poll-click engagement data from an online platform is not a substitute for substantive submission analysis. The failure to disaggregate responses, detect the source of organised participation, or require engagement with the actual proposal content produced an analysis that actively misled decision-makers.

Success: Expert Submissions Prevent a Poor Environmental Decision

CASE STUDY Rigorous qualitative analysis of specialist submissions identifies fatal flaw in environmental modelling
Outcome: Development approval deferred; environmental assessment methodology revised

An environmental protection authority consulted on a draft conditions framework for a proposed industrial development in a coastal zone. A structured submission questionnaire was used, with specific questions asking respondents to address each of the assessment criteria and reference the relevant sections of the draft conditions.

The consultation received 89 submissions. While the majority were brief and expressed general support for the development, the analysis team applied a rigorous qualitative coding approach to all responses, with a specific code for “methodological concerns” applied to any submission raising questions about the validity of the environmental modelling approach.

Seven submissions — from an independent marine ecologist, two university research groups, and a peak body for environmental consultants — all received this code. Their arguments were specific and technical: the hydrodynamic modelling used to predict sediment dispersal had been calibrated using data from a different coastal system with materially different tidal characteristics.

The analysis report presented these submissions together in a dedicated section, included an extended summary of each argument, and explicitly noted that while these seven submissions represented less than 8% of total responses, they collectively identified a single specific and verifiable methodological concern rather than a general policy objection. The report recommended that the authority seek technical review before finalising the conditions.

The authority commissioned an independent peer review of the hydrodynamic modelling. The review confirmed the calibration problem. The development applicant was required to commission new modelling before approval conditions could be finalised, adding approximately eight months to the timeline.

Key lesson: Qualitative analysis that distinguishes methodological challenges from general opinions, and that weights evidence rather than counting responses, can surface critical technical problems that would otherwise be submerged in a large submission dataset.

Lessons Across the Case Studies

•  Structure matters: Questionnaires anchored to document sections enable pattern recognition across submissions that unstructured processes cannot replicate
•  Weight of evidence, not volume: The most consequential submissions are often a small minority, analytical frameworks must be designed to surface them
•  Campaign identification is non-negotiable: Failure to identify and disclose organised campaign responses has resulted in legal challenges and overturned decisions
•  Disaggregation by stakeholder type reveals what aggregate figures conceal: Support figures that look strong overall may mask strong opposition among directly affected groups
•  Methodology must be documented and defensible: Analysis processes that cannot be scrutinised and explained expose organisations to procedural challenge
•  Online poll responses are not submissions: Engagement platform data should not be treated as equivalent to structured, document-engaged submissions

Evaluation of a Submissions Management Process

How do you evaluate or judge the success or failure of a submissions management process? Is it the number of submissions you receive or some other metric?

Here are our recommendations for best metrics to use when evaluating your submissions management process, based on key principles for good stakeholder engagement, such as The Brisbane Declaration – United Nations standards for Community Engagement which our founder helped develop:

  • Quality of submissions
    • Did the submissions depict confusion or uncertainty about key aspects of the proposal which could’ve been addressed earlier and with better communication from the proponent?
    • Did the submissions indicate engagement with the content of the proposal – indicating deeper engagement and deliberation?
  • Diversity of repondents – did you obtain submissions from a diverse group of stakeholders (look at role of stakeholders, geographic distribution, demographic details as well as stakeholder mapping details such as stakeholders with high levels of impact or interest. Also give specific consideration to the participation of poor and marginalised communities and Indigenous communities.)
  • Did the submissions process offer the opportunity for participants to influence the proposal? Was that opportunity realised?
  • How were the results of the submissions management process communicated to the respondents and the broader stakeholders, especially in relation to the impact the submissions had on the proposal?

Image of two people looking at a document

How Simply Stakeholders Streamlines Submissions Management and Reporting

Simply Stakeholders is a stakeholder relationship management platform used by government agencies and businesses to manage engagement, track interactions, and analyse submissions and feedback. Its built-in survey and forms function, combined with purpose-built analytical and reporting tools, makes it particularly well suited to the submissions management workflows described in this guide. The following explains how key Simply Stakeholders features directly address the challenges of managing and analysing structured questionnaire responses at scale.

Built-In Survey and Forms Tool

Simply Stakeholders includes a native forms and survey builder that allows teams to construct structured questionnaires directly within the platform. Forms support flexible question types, including scaled rating questions, multiple choice, ranking, and open-text fields, and can incorporate skip logic to route respondents through only the questions relevant to their stakeholder category or role. This means the questionnaire design best practices described in Section 4 can be implemented directly in the platform without relying on a separate survey tool.

Completed form responses flow automatically into the stakeholder records system, linking each submission to the relevant stakeholder profile. This eliminates the manual data entry step that consumes significant time when questionnaire responses are received via separate survey platforms and must then be matched to stakeholder records for classification and disaggregation.

Automatic Issues Detection and AI-Assisted Sentiment Analysis

One of the most time-intensive steps in analysing open-text submissions is the initial read-through to identify the issues and themes each response raises. Simply Stakeholders automates this step through its proprietary AI models, which automatically detect issues and analyse sentiment each time a new interaction, including a survey or form response, is added to the system.

Teams configure a set of issues categories relevant to their project or consultation in advance (for example: “Traffic and Access”, “Environmental Impacts”, “Economic Benefits”, “Implementation Timeline”). As submissions arrive, the system automatically highlights which issues are detected in each response and assesses whether the sentiment is positive, negative, or neutral. This provides an immediate at-a-glance view of the emerging patterns in the submission base before manual coding has begun, significantly reducing the time required for initial triage.

Critically, Simply Stakeholders AI analysis is “strictly controlled” with algorithms specifically designed for stakeholder engagement contexts, rather than general-purpose sentiment models. This is important for complex document submissions management, where nuanced professional language and technical terminology can mislead general-purpose sentiment classifiers.

Qualitative Analysis Tools

Beyond automated issue detection, Simply Stakeholders provides tools for manual qualitative analysis that complement the AI-assisted layer. Analysts can annotate individual responses with comments, tag specific quotes for inclusion in reports, and apply additional codes beyond those detected automatically. This supports the thematic coding workflows described in Section 5.3, allowing teams to build a structured, searchable coding layer across the full submission dataset.

The ability to pull annotated quotes directly into reports is a particularly valuable feature for the submissions analysis context, it streamlines the process of selecting illustrative verbatim examples for each theme, which is otherwise a slow manual task involving cross-referencing spreadsheets and documents.

Stakeholder Segmentation and Disaggregation

Simply Stakeholders maintains a central stakeholder register that records each contact’s organisation, role, sector, geographic location, and any other classification attributes the team configures. When submissions are received via the built-in forms tool, responses are automatically linked to existing stakeholder profiles or new profiles are created. This means that disaggregated analysis, breaking down responses by stakeholder type, sector, or geography, can be performed directly within the platform without manual cross-referencing.

The platform also supports multidimensional stakeholder mapping, including influence, interest, and impact dimensions. This allows analysis teams to weight or contextualise submissions not just by stakeholder type, but by the relative influence and stake of each organisation, supporting the “weight of evidence” analysis approach described in Section 5.3.

Reporting and Dashboard Tools

Producing a submissions analysis report is typically one of the most time-consuming phases of a consultation process. Simply Stakeholders includes custom reporting dashboards that can be configured to display the key metrics and visualisations needed for a consultation report, including sentiment distributions, issue frequency charts, submission volumes by stakeholder group, and trends over the consultation period.

Reports can be saved, exported, and scheduled for regular distribution, making it straightforward to provide progress updates to project teams during the consultation period as well as producing the final analysis report. The platform’s AI Summaries feature can generate narrative summaries of the data, which analysts can then refine and expand, accelerating the drafting process without replacing the judgement and interpretation that a skilled analyst brings.

Centralised Record and Audit Trail

As the case studies in Section 6 illustrate, the defensibility of a consultation process depends heavily on the existence of a complete and auditable record. Simply Stakeholders maintains a full interaction history for every stakeholder, recording every submission, email, meeting, and event linked to the consultation. This creates a single source of truth that can support responses to freedom of information requests, judicial review proceedings, or internal audit requirements.

The platform also supports integration with external systems, including online engagement platforms such as those described in Section 2.1, via API and integrations including Zapier. This means organisations that use both an engagement platform for community awareness and a Simply Stakeholders questionnaire for structured submissions can consolidate all consultation data into a single record, preventing the fragmentation of evidence that has contributed to the failures described in the case studies.

Automated Workflows for Risk and Escalation

For large-scale consultations where submissions may raise issues requiring immediate action, for example, a submission that identifies a safety risk, a legal compliance concern, or a significant reputational issue, Simply Stakeholders supports automated workflows that trigger notifications or tasks when specific issue categories or sentiment thresholds are detected. This ensures that high-priority submissions are routed to the right team member promptly, rather than being buried in a large submission queue awaiting the end of the consultation period.

Simply Stakeholders: Key Benefits for Submissions Management

•  Native survey and forms builder with flexible question types and skip logic, no separate survey tool required
•  Automatic AI-assisted issues detection and sentiment analysis on every submission as it arrives
•  Qualitative annotation and quote-tagging tools that integrate directly with report generation
•  Stakeholder register links every submission to a stakeholder profile for instant disaggregation by type, sector, or geography
•  Custom reporting dashboards with charts, summaries, and scheduled export, accelerating report production
•  Complete auditable interaction history provides a defensible record for regulatory and legal purposes
•  Automated workflows escalate high-priority submissions to the right team member in real time
•  Integration with engagement platforms and email tools consolidates all consultation data in one place

Graphic showing six tips for closing the loop in submissions management

Practical Considerations for Submissions Management Administration

Consultation Period

The consultation period should be long enough for respondents to read the document and prepare a considered response. For complex technical documents, a minimum of four to six weeks is generally appropriate. Shorter periods disadvantage professional stakeholders who may need to seek internal approval before submitting. Avoid scheduling the close date during public holidays or periods of peak workload for target stakeholder groups.

Promotion and Distribution

A structured questionnaire only generates useful data if it reaches the relevant stakeholders. A targeted distribution strategy is essential, including direct notification to known stakeholders via email, publication on the organisation’s website and social media channels, and engagement with peak bodies and representative organisations who can distribute to their members. Consider whether an online engagement platform might usefully complement the questionnaire by directing a broader audience to it, this hybrid approach captures the audience reach of platforms while preserving the analytical rigour of the questionnaire.

Confidentiality and Privacy

Be clear with respondents about how their information will be used, whether responses will be published, and whether identifying information will be removed. Many professional stakeholders actively want their submissions attributed to their organisation, while individuals may prefer anonymity. Design the questionnaire to accommodate both, with explicit questions about publication preferences. Ensure the process complies with applicable privacy legislation.

Combining with Targeted Interviews or Workshops

For very complex documents or consultations where deep expertise is essential, consider supplementing the questionnaire with targeted interviews or workshops with key stakeholders. This allows for exploration of issues in greater depth than a questionnaire permits and can generate insights that inform both the questionnaire design (if conducted beforehand) and the interpretation of questionnaire results (if conducted alongside or after). This comprehensive approach to submissions management certainly provides a more defensible position, particularly in relation to highly-contested situations.

Summary

Structured questionnaires are the most effective tool for gathering and analysing feedback on complex documents. They ensure respondents engage with the content, produce data that can be systematically compared and analysed, accommodate both professional and community respondents, and provide a transparent and auditable process. The case studies in this guide illustrate vividly what is at stake: well-designed structured submissions management processes have saved projects from costly design errors and enabled technically important concerns to reach decision-makers; poorly designed or inadequately analysed processes have produced misleading reports, overturned decisions, and in at least one case, legal challenge.

When supported by a purpose-built platform like Simply Stakeholders, the submissions management process becomes significantly more efficient and rigorous. Automatic issues detection and sentiment analysis accelerate the initial triage of responses; qualitative annotation and reporting tools streamline the production of analysis reports; stakeholder segmentation enables disaggregation by type and influence; and a complete auditable record protects the organisation against future challenge. Together, these capabilities address the core risks identified in the failure case studies, poor campaign identification, inadequate expert submission weighting, and indefensible reporting methodology.

Online engagement platforms remain valuable for awareness-raising, community engagement, and reaching broad audiences. Where both are used together, the questionnaire should be the authoritative source of analysable submission data, with the engagement platform serving to drive participation and public awareness, and Simply Stakeholders providing the analytical backbone that turns raw responses into defensible, decision-ready insights.

Simply Stakeholders is a smart (but simple) stakeholder relationship management tool that makes it easier than ever to analyze your stakeholders and visually map them based on 6 different criteria, as well as your stakeholder relationships.

Not only that, but our built-in AI-powered sentiment analysis enables up-to-date insights on your stakeholders throughout the entire project and especially for submissions management.

Interested in learning more about effective submissions management? Take a look at our other features or contact us to request a demo of our submissions management functions.

]]>
Social License: Why it Matters For Your Project or Organization https://simplystakeholders.com/resources/guides/social-license/ Mon, 21 Oct 2024 09:07:54 +0000 https://dev.veribo.ro/simply-new/?post_type=guide&p=3063

As a mining company, developer, or organization working on a project or within a community, you might need to get a formal license from the government or a regulatory body. But this isn’t necessarily enough to allow you to go ahead with your project or work.

These days, you may also need a ‘social license’.

But getting your hands on one isn’t as straightforward as submitting some forms and ticking the right boxes.

Let’s explore the concept of social license, including what is, why it matters, how to get (and keep) it, and some interesting examples of what it looks like in practice.

 

What is a Social License?

A social license can be tricky to measure or define. It isn’t something you can officially apply for. Nobody is handing out certificates you can display on your office wall. And the requirements for obtaining (and retaining) a social license will vary for each community, project, industry, and stakeholder group.

Remember back when at school when you were learning how to write and you had to get your pen license? Before you were allowed to operate a pen, you first needed to prove that you could write neatly with a pencil.

A social license is a lot like that. In order for a project to go ahead, the project team and organization might be required to prove themselves and gain community acceptance — for the duration of the project or work. It’s almost like a ‘social contract’ between the business and its stakeholders.

 

Social License Definitions

According to Investopedia, a social license to operate (or SLO) ‘refers to the ongoing acceptance of a company or industry’s standard business practices and operating procedures by its employees, stakeholders, and the general public.’

 

Meanwhile, SocialLicense.com defines it ‘as existing when a project has the ongoing approval within the local community and other stakeholders, ongoing approval or broad social acceptance and, most frequently, as ongoing acceptance.’

 

And Springer says that a social license ‘refers to the perceptions of local stakeholders that a project, a company, or an industry that operates in a given area or region is socially acceptable or legitimate.’

 

To sum it up, the generally agreed upon definition for a social license to operate is ongoing community or stakeholder acceptance of an organization, project, or its activities. 

 

But another interesting viewpoint comes from this journal article — that a social license is perhaps better seen as a ‘continuum of multiple licences achieved across various levels of society’. In other words, an organization or project might need to gain acceptance and approval across multiple groups, rather than gaining a single ‘community license’.

 

Why a Social License Matters

People crossing a city street.

So, why should organizations care about their social license? There are a number of benefits to having the acceptance of your community or stakeholders — and reasons why it’s more important than ever.

 

Stay Ahead of Tightening Legislation

One of the reasons a social license is being seen as the new standard for social expectations (compared to simply complying with current legislation) is due to the way legislation has changed in recent years. In many countries, corporations have seen governments increasingly legislate change and tighten laws in response to social and environmental impacts. By going beyond compliance, corporations may stay ahead of regulatory changes that would otherwise disrupt their work.

 

Build Trust with the Community

Strong relationships built on mutual trust and respect are an important foundation for any project. In order to attain and maintain a social license to operate, organizations need to build trust with the community through listening, engaging them in dialogue, providing credible information, and following through on commitments.

 

 

Social License in Practice: Community Opposing High Voltage Transmission Lines

Community opposition to new high voltage transmission lines is causing a bottleneck for Australia’s National Electricity Market (AusNet). More than 10,000km of transmission lines are needed to carry renewable energy that will support goals to decarbonize by 2050. Local communities are resistant due to their footprint, imposition on land corridors, and intrusion on personal property. The infrastructure has backing from the government and the National Farmers Federation, but in order to go ahead without major delays, it also needs the green light from local communities.

 

Engage Stakeholders Meaningfully

Group of people discussing an issue in a meeting.

We always promote the importance of meaningful engagement — as opposed to the kind of engagement that’s designed to tick boxes just so the project can move forward. Pursuing a social license to operate can encourage organizations to engage stakeholders in a more meaningful way. For example, companies may need to demonstrate that they are:

 

  • Accountable to stakeholders
  • Including the right stakeholders in conversations
  • Taking a collaborative approach
  • Learning from stakeholders’ perspectives and insights

 

This kind of stakeholder engagement ensures that stakeholders can have a real impact on the outcomes that affect them — and this can help increase a community’s acceptance of the work or organization.

 

Meet Changing Societal Expectations

More than ever, communities expect and demand greater involvement in the decisions that impact them. While several decades ago, it may have been considered acceptable for organizations to stick to any regulations and keep stakeholders informed, stakeholders now expect a chance to sway outcomes and share in any benefits. In the age of consent (with social media making nearly any stakeholder a potential force of power and influence), making sure you have social permission to go ahead is critical.

 

Social License in Practice: Supporting Marine Sustainability

The social license to operate is particularly important for farmed fisheries and wild capture fishing operations. With increasing concerns around the sustainability of fishing activities and challenges with marine governance, fishing businesses face greater pressure from local communities and organizations to demonstrate that they’re doing the right thing and can be trusted. Fisheries that better communicate their sustainability measures and contributions, in alignment with stakeholder expectations will be better positioned to gain community and stakeholder acceptance.

 

Increase Acceptance of Change

One interesting illustration of a social license (and how it works) is the way that drunks are tolerated in some societies and social settings — despite some unwanted and unacceptable behavior. So, why are they allowed to remain (at least, until the behavior crosses a line)? It’s because they can be a great source of unspoken truths (and entertainment). In the same way, an organization’s presence and activities may be allowed if they play a valuable role for the community in some other way.

 

Increase the Success of a Development

For many projects, a social license to operate can play a significant role in determining whether it is successful or not. Not only because a community’s approval can help to improve reputations and reduce potential roadblocks. But also because the process of gaining and maintaining community acceptance can force the organization to:

 

  • Better engage the community
  • Listen to others and explore different perspectives
  • Find social and environmental risks that could impact the project plans
  • Operate with greater transparency
  • Fix problems in a timely manner

 

Engage Stakeholders to Gain (or Maintain) a Social License to Operate

People in corporate clothing shaking hands.

Stakeholder engagement is closely entwined with the social license to operate. Done right, your engagement can help you to gain or hold onto that license. But if you don’t manage and engage your stakeholders appropriately, you could cause more harm than good.

Here’s 12 tips to help you manage and engage with stakeholders in a way that supports your social contract with the community.

 

1. Identify Your Stakeholders

The requirements for your social license will depend a great deal on who your stakeholders are — and what they think of you. So it’s important to go through the steps of stakeholder identification, mapping, and analysis.

 

2. Categorize Your Stakeholders

Who do you need approval and acceptance from? Which of your stakeholders can issue your social contract?

Within each community, there are multiple groups and stakeholder types — each with different levels of interest, impact, and influence. To efficiently engage with them, you must use your stakeholder analysis to categorize your stakeholders. Then you can tailor your approach to make it meaningful to each group, while increasing acceptance for your project from the community members most likely to grant (or remove) your social license.

 

3. Ask the Right Questions

Colleagues in discussion.

If you’re surveying stakeholders, make sure you ask questions that allow people to contribute a meaningful response. Each question should serve a clear purpose — otherwise, you’re wasting people’s time just so you can ‘tick another box’.

Part of asking the right questions means not making people repeat themselves. Use a system like Simply Stakeholders that allows you to record stakeholder interactions and responses. This can help you refer to past responses instead of asking the same questions over and over again — and help you build stronger relationships over time. (Remember — social license is about ongoing acceptance — so assume you’ll be working with the same stakeholders for a long period of time.)

 

4. Bring in the Right People

Your organization has a responsibility to ensure they engage a mix of participants that match the community’s demographics. If there’s someone missing, you should actively seek their input and make sure your engagement methods, locations, and times are accessible to them.

 

5. Let Your Stakeholders Set Your Standards

You don’t get to decide what actions are appropriate in order for you to gain approval from the community. It’s up to your community stakeholders. This means you must engage your stakeholders when doing your due diligence to understand the social or environmental risks at play. Together, you should determine what prevention or mitigation measures are reasonable.

 

Social License in Practice: Gap

Gap provides an interesting example of what a social license can mean for companies when things go wrong. From 2003-2007, they engaged with multiple stakeholders about how they could reduce the risk of labour abuse in the supply chain. They were transparent about their mitigation measures, leading to a degree of stakeholder approval. In 2007, when child labour was claimed by a supplier in India, Gap were defended by many stakeholders who noted their previous level of due diligence.

 

6. Be Transparent

Stakeholder engagement can support greater transparency and build the trust needed for creating a social license. So, how can you engage stakeholders in a way that increases transparency?

Stakeholders are more likely to see an organization as transparent or open when they quickly review, act, and report on issues — especially issues that matter to stakeholders. If you’re too slow to communicate the issue, stakeholders may suspect you’re hiding something. If you don’t act upon it quickly enough (or at all), stakeholders may suspect that you don’t align with them on the issue.

To do this effectively, you first need to take a few steps back and proactively identify what issues matter to each of your stakeholder groups. Then engage with them to understand their expectations (and manage them) so that you can keep the right people informed at the right time — and take the right actions.

 

Social License in Practice: Safaricom Mobile Phone Operator

Safaricom, a mobile phone operator in Kenya, had their network (among others) used to spread hate speech following the 2007 elections. These sparked violence that led to over 1,000 deaths. Prior to the next election in 2012, Safaricom doubled down on measures that would prevent the situation from reoccurring. They shared how they were limiting hate speech while protecting freedom of speech. Their actions, transparency, and focus on issues that mattered to their stakeholders helped them develop stronger acceptance in the community through a challenging time.

 

7. Communicate Regularly

Regular communication is an important part of stakeholder engagement and supports your social license by:

 

  • Educating stakeholders about the project to increase confidence and reduce concerns
  • Promoting any benefits of the project to increase support
  • Sharing updates about the project to keep people informed
  • Promoting ways to get involved and share feedback
  • Reporting on any results of the engagement and how the community is having an impact
  • Supporting efforts to build long-term relationships

 

Ideally, communication should be strategic and targeted, ensuring that stakeholders receive information that’s most relevant to them in a format that they’re more likely to engage with.

 

8. Engage in Two-Way Conversations

It’s important to go beyond just communication and offer opportunities for stakeholders to engage in two-way conversations and meaningful dialogue with your organization. This can enable you to discuss issues, address stakeholder concerns, quickly build trust, and even share in decision-making. Suitable platforms may include face-to-face or online meetings, public forums, online chat, email, and phone calls.

 

Social License in Practice: Pebble Mining Project in Alaska

Pebble, Alaska is a controversial mining project upstream of a salmon fishery. They underwent a public engagement exercise that was designed to help stakeholders decide whether and how the gold-copper-molybdenum deposit should be mined. Stakeholders on both sides looked at environmental study data but couldn’t come to a consensus around acceptable risk to the salmon fishery. Before they could go ahead with the final planned phase of the dialogue (involving collaborative community-company mine planning) and before they could achieve a social contract, the partnership behind the mine dissolved.

 

9. Treat People Fairly

It’s important to mitigate any negative operational impacts of a project or activity. But despite some negative impacts, if their engagements with personnel and community stakeholders are high quality and they’re seen to treat people fairly, a project may still be perceived in a positive light.

 

10. Think Long-Term

A social contract is only valid for as long as the project or organization has the community’s acceptance and approval. You must develop long-term relationships with your stakeholders — and put systems in place to support a long-term engagement. Use a tool (like Simply Stakeholders) that can track all your stakeholder communication, allowing you to build on your relationships with each interaction.

 

11. Ongoing Monitoring

Over the length of the project and engagement, you’ll need to respond to changes that may arise. It’s important to continually monitor the situation by gathering feedback, analyzing sentiment, and engaging with stakeholder groups. And be prepared to make adjustments as you go in order to hold onto your social license and continue building long-term relationships in the community.

 

12. Operate Responsibly

Last but not least, it’s worth mentioning that stakeholder engagement and management is just one side of the coin. To maintain social license in the long term, it’s not enough to plan with good intentions or say you’ll do the right thing. You actually need to operate responsibly and ethically, considering how each activity and decision might impact the community and environment. This is because community approval and acceptance can be quickly lost if your actions don’t match up with your words.

 

Stakeholder Software to Support Your Project

Simply Stakeholders dashboard screenshot.

To do stakeholder engagement properly — the kind of engagement that helps your social license to operate — you need the right tools for the task.

Simply Stakeholders can help support the entire stakeholder engagement process for your project. Features include:

 

  • Stakeholder records and interactions
  • AI-driven sentiment analysis
  • Stakeholder analysis and mapping
  • Stakeholder communication (including email and text)
  • Monitoring and reporting

 

Take a look at how our stakeholder software works or contact us to request a demo.

]]>
Guide to Stakeholder Analysis https://simplystakeholders.com/resources/guides/stakeholder-analysis/ Mon, 21 Oct 2024 08:57:36 +0000 https://dev.veribo.ro/simply-new/?post_type=guide&p=3041

Curious about stakeholder analysis — what it is, why bother with it, and how you actually do it? Confused by all the info out there and want it broken down in easy-to-understand terms?

This Super Simple Guide to Stakeholder Analysis will equip you with the basic definitions and concepts, as well as touching on more advanced ideas (for when you’re ready to dive deeper).

You’re in the perfect place if you’re a stakeholder industry newbie. But if you work with stakeholders in any capacity (including project managers, communications managers, and executives), this guide will help to build on what you already know and challenge you to up your stakeholder analysis game.

Let’s start with the definitions…

Stakeholder Analysis Definition

Who are Stakeholders?

Stakeholders include any people or groups involved in (or impacted by) a project, organization, or action. Some common examples of stakeholders include employees, shareholders, customers, government bodies, members of the public, businesses, and regulatory bodies.

Learn more: What Does Stakeholder Mean?

What is Stakeholder Analysis?

Stakeholder analysis involves identifying who your stakeholders are, working to understand their interest in and influence on the project, how your project or work will affect them, and grouping them based on this understanding.

What Isn’t Stakeholder Analysis?

We’ve talked about what stakeholder analysis is, but what are some common misconceptions about it? What isn’t it?

Although you may use some data to conduct your stakeholder analysis and the phrasing may sound similar, the practice of analyzing stakeholders has very little to do with analytics.

Another misconception is that stakeholder analysis works as a standalone process. But it is just one (very important) part of the overall stakeholder process. What really matters is applying the insights you gain so that you can better engage with, consult with, and manage your stakeholders.

Finally, stakeholder analysis is not a one and done process. As your stakeholders, project, and environment shift, you may need to revisit your analysis.

What is ‘Interest’?

The concept of “interest” is more than an idea of how interesting your project is to the stakeholder, or how interested they are in being involved. Think of “interest” in more of a legal sense of a right to be involved or consulted. For an infrastructure project this may be legal rights such as a lease or property ownership, or even just regular use of a site. There could also be cultural, social and historical connections with the area, particularly with First Nations groups, which also confers an “interest” in that area.

What is ‘Influence’?

Each stakeholder has a different level of influence on a project, depending on their ability to impact the process and outcomes. In some projects, influence may also be referred to as “power” — though they are not exactly the same thing.

What is ‘Impact’?

Each stakeholder may be impacted by the project in different ways — positively, negatively, or a mixture of both. There could be direct impacts such as on their livelihood or ability to work (such as restrictions on access to fishing areas), or on the property they own (such as land acquisition or resettlement). It’s important to consider all impacts a project or work can have on stakeholders, including physical, economic, social and cultural.

Why Should You Do Stakeholder Analysis?

Infographic: why analyze your stakeholders?

Curious about the importance of stakeholder analysis? Stakeholder analysis is the logical first step in your stakeholder management or engagement process. Here’s what identifying, understanding, and organizing your stakeholders can help you do…

1. Improve the Quality and Accuracy of Stakeholder Lists

How successful you are likely to be with managing stakeholders rests heavily on your stakeholder lists. If they’re not accurate or up-to-date, you’re essentially flying blind.

Analyzing your stakeholders can help you spot gaps and figure out who’s missing. Plus, it’s the perfect time to improve your stakeholder lists by moving them into a stakeholder management tool, cleaning up duplicates, and updating contact info.

2. Understand Stakeholder Motivations

What makes people think and act a certain way? Is it their political or religious beliefs? Their values and demographics? Through stakeholder analysis, you can gain new insights into people’s motivations that allow you to tailor your communication, focus areas, and stakeholder activities so that they’re more meaningful and effective.

3. Know What Areas to Focus On

Chances are, you’re looking at a long list of issues that could be relevant to your stakeholders. It may not be practical to tackle every issue in your communication and engagement strategy — certainly not all at once. Stakeholder analysis can help you uncover which issues are the most important (and to whom) so that you can focus on these first.

For example, you might find out that key stakeholders care a lot about environmental impacts of the work you’re doingt. Talking more about your organization’s efforts to mitigate the environmental impact of a project could be a good focus area in order to build social license to operate.

4. Identify Your Key Stakeholders

The stakeholder analysis process can help you identify who you need to pay the most attention to. Your key stakeholders are those with greater interest and/or greater influence, and it may be critical to get their input on the project, keep them informed more regularly, and build social capital.

We share more about this in our article on identifying and prioritizing stakeholders.

5. Reduce Overwhelm

If you’re looking at a list of thousands stakeholders, it can quickly get overwhelming. Where do you start? Who do you start with?

Stakeholder analysis helps to break the list down into smaller, more manageable groups. This can make it much easier to develop engagement and communication strategies tailored to the needs and interests of each group.

6. Prioritize Limited Time and Resources

Limited time and resources are one of the main challenges for stakeholder professionals and project managers. If you only have 10 hours each week to devote to the project, how can you really make an impact if you have to split that time between so many people?

It’s probably not realistic to speak to everyone individually. But analyzing your stakeholders will help you organize them into groups, better prioritize your resources, and may even free up your time to give individualized attention to a handful of key stakeholders.

7. Build a Case for More Resources

Stakeholder analysis can help you demonstrate the resources needed to manage or engage your stakeholders. You’ll be able to show the number of stakeholders, the different groups involved, and the potential impacts of stakeholders (both positive and negative) if managed properly.

Stakeholder Analysis Methods

Stakeholder maps can be a useful tool for stakeholder analysis because they help to visualize stakeholders based on their attributes and how they relate to the work you’re doing.

Some of the more traditionally used stakeholder mapping models include:

  • The Salience Model – Each stakeholder is assigned a level of power, legitimacy, and urgency to determine their priority
  • The Stakeholder Knowledge Base Chart – Stakeholders are mapped on a quadrant based on their level of awareness and whether they support or oppose the project or work
  • The Power/Interest Grid – Each stakeholder is mapped on a quadrant based on their degree of power and level of interest
  • The Power-Predictability Matrix – Each stakeholders is mapped on a quadrant based on their degree of power and how predictable they’re likely to be

But just because the above models are often used doesn’t mean they’re the best way to map stakeholders. In fact, there are some problems with the historical approach to stakeholder mapping.

We share more about different stakeholder mapping approaches in our blog on stakeholder mapping, but to sum it up, there are three main issues.

Firstly, these models are dated, as power is no longer centrally held. Now, low influence stakeholders can become a very strong force if they network together — something which is easier to do than ever thanks to social media platforms.

And secondly, the language used to describe people in some of the older models is best left in the previous century.

Finally, most of these models only focus on a very limited subset of stakeholder attributes. This makes them quite flat and two-dimensional, which really limits what you can analyze and visualize.

Fortunately, there are other options…

Modern Stakeholder Mapping Approaches

Multidimensional Stakeholder Mapping

Example chart from multi-dimensional stakeholder mapping.
Simply Stakeholders has a new and better way of doing stakeholder mapping. We use Multidimensional Stakeholder Mapping based on 6 highly relevant criteria:

  • Influence – What level of influence does the stakeholder have over the project? (from very low to very high)
  • Interest – What level of interest does the stakeholder have in the project? (from very low to very high)
  • Impact – To what degree is the stakeholder likely to be impacted by the project? (from very low to very high)
  • Criticality – How critical is the stakeholder to the desired outcomes of the project? (from very low to very high)
  • Effort – What level of effort is required to engage with this stakeholder? (from very low to very high)
  • Position – What is the stakeholder’s position towards the project? (from very negative to very positive)

Note: we used to refer to this as the Three I’s Method before increasing our criteria from 3 to 6!

Inside our software, users can track both engagements and Contact Groups based on the above attributes to strategically plan an engagement, prioritize actions, and track progress towards goals.

Relationship Mapping

Graphic showing an example of stakeholder relationship network mapping.

Another type of modern stakeholder mapping built into Simply Stakeholders is stakeholder network maps. This is a bit like mindmapping for stakeholder relationships — you can see who is connected to whom within your organization, between your stakeholders and your organization, and between stakeholders themselves. But with different colors, shapes, and sizes, you can also display other attributes and information about your stakeholders and relationships, like:

  • Direction of influence
  • Level of influence/impact of a stakeholder
  • Type of stakeholder
  • Strength of relationship
  • Level of involvement
  • Sentiment or support

Being able to visualize this kind of information is incredibly valuable for planning your stakeholder engagements, strategically approaching your relationships, and reporting on your progress. Learn more about relationship mapping and stakeholder relationship networks — you’ll definitely want to add these to your toolkit!

Stakeholder Sentiment Analysis

We also track stakeholder sentiment inside Simply Stakeholders. Although this isn’t strictly stakeholder mapping, it can provide valuable context alongside your stakeholder maps.

A stakeholder sentiment analysis can help you understand your stakeholder’s emotions. Are they feeling positively or negatively towards the project or a particular issue? How is that sentiment changing over time? You can analyze sentiment by looking at the tone and words stakeholders use in survey responses, call recordings, emails, and other communication.

We talk more about this in our blog on 5 simple steps to getting started with stakeholder data management.

Tip: If you use Simply Stakeholders, our AI-powered sentiment analysis will automatically identify the sentiment behind each recorded interaction and tag stakeholders accordingly.

How To Do Stakeholder Analysis?

Infographic showing how to do stakeholder analysis in four steps.

Step 1: Stakeholder Identification

Before you can analyze your stakeholders, you need to know who they are. Start with your existing list (if you have one) and do some brainstorming to see who might be missing.

Mind mapping software or a good, old-fashioned on a whiteboard can be a helpful exercise here. It’s also worth talking to a variety of people in your organization to find out what groups and individuals they deal with, as well as those they expect to come across throughout the project or work. The more perspectives you get, the less likely you’ll miss someone.

Remember: your stakeholders are any individuals or groups who might impact your project or be impacted by it. Plus, anyone you’re required to consult with.

Tip: If you’re not sure if someone is a genuine stakeholder, add them to your list anyway so you can keep moving forward. You can always come back later and remove anyone that doesn’t fit once you’re finished the brainstorming process.

Step 2: Stakeholder Assessment

Once you’ve identified all your stakeholders, it’s time to assess and analyze them. The  stakeholder assessment process you use here will depend on which stakeholder mapping method you choose to work with. But you’ll likely look at their interest, impact, power, attitudes, and other attributes.

Tip: Once you’ve done your initial stakeholder mapping, you might go further by asking your stakeholders questions via a survey or phone call. Useful questions can tap into their communication preferences, motivations, what influences them, who they influence, and what information they’d like to get from you.

It can take some time to assess each stakeholder, especially if you need to work through a long list of contacts. But it’s worth doing this step properly, as it will set you up for the next step. Plus, it’ll enable you to effectively tailor (and prioritize) your stakeholder management approach, communication, and engagement activities.

Step 3: Stakeholder Grouping

After you’ve finished stakeholder mapping, you’ll notice that some stakeholders have similar attributes. These stakeholders can be grouped together (or segmented!), reducing the complexity of your stakeholder list while enabling you to tailor your approach to meet each stakeholders’ needs.

This process will also help you identify which priorities to focus on first, based on the top concerns of your key stakeholders.

Step 4: Apply Insights & Repeat

Next it’s time to bring your insights into your other processes. This might mean your stakeholder engagement/management plan, communication, or other parts of your project or work.

And then repeat the process regularly. After all, stakeholder lists are not static. Your individual stakeholders and groups will shift over time, along with their attributes, interest, influence, sentiment, and more. It’s a good idea to regularly analyze your list and adjust your stakeholder planning and activities accordingly — especially for longer projects and pieces of work.

Tip: Regular stakeholder analysis is much easier when using a tool like Simply Stakeholders. Integrate your email and SMS interactions so that our AI-driven sentiment analysis can automatically tag each stakeholder and interaction with up-to-date sentiments.

Plus, this can help you monitor how your stakeholders change over time in response to communication, engagement, project changes, and the environment. You can use these insights to understand how well you’re doing while there’s still an opportunity to impact the outcome.

How to Use Stakeholder Analysis

People discussing stakeholder analysis.

You can gain a lot of insights from analyzing stakeholders, including who you should focus on, how to best work with them, when (and how often) to interact with them, and what issues you need to focus on. These insights can be used in many different ways, like…

Creating a Stakeholder Plan

Stakeholder analysis is the first step in every good stakeholder plan because you can only identify appropriate strategies after you know who your stakeholders are.

Want to learn more about stakeholder planning, including the other steps? Download our free eBook on how to create a stakeholder management plan.

Stakeholder Management

Stakeholder management is an umbrella term that encompasses a range of methods and approaches to managing, monitoring, and interacting with stakeholders.

Stakeholder analysis can help you understand who you’re managing, the most effective ways to manage them, and what areas might need closer monitoring.

Public Participation

Public participation is also known as public involvement or citizen participation. This approach to stakeholder management facilitates an environment where members of the public (who are impacted by or interested in a decision) are involved in the process.

Stakeholder analysis can help to support accountability in public participation. For example, it can help you identify who makes up ‘the public’ so that you can work towards getting balanced participation across all groups.

Stakeholder Engagement

Stakeholder engagement is focused on building relationships with stakeholders — including both internal engagement and external engagement. The goal of engagement is to get stakeholder support and/or benefit from their perspectives.

Like other approaches, analysis forms the first step in a stakeholder engagement plan. It can help you identify stakeholders’ degree of interest/influence, and which stakeholders you need input from on different issues (getting clear on this as early in the process as possible).

Creating a Communication Plan

Stakeholder analysis often forms part of a communication plan. It can reveal useful insights into who you need to communicate with, including:

  • What issues they want to hear about the most
  • Sensitive issues to avoid or approach with greater care
  • Knowledge gaps and stakeholders that could benefit from additional information
  • What platforms/mediums are best for reaching each group
  • How often you need to communicate with different groups

Project Management

Since stakeholder management forms a major part of project management, project managers can benefit from analyzing their stakeholders before the work begins. Stakeholder analysis is especially useful for identifying stakeholders you may have otherwise missed. And it can help to identify potential issues and opportunities early on — for example, a manager who isn’t on board with the project, or a champion for change who can help to influence others.

Stakeholder Analysis Examples

Perhaps the best way to truly explain stakeholder analysis is to illustrate it with some examples. So, let’s break down why you might conduct stakeholder analysis and what methods you might use across four different scenarios.

Stakeholder Analysis for a New Wind Farm

Let’s say a company is looking to install a new offshore wind farm off the coast. Stakeholder analysis would be important for this project to understand who the stakeholders are, which stakeholders are more critical to engage with, anticipate various risks/objections to the project, and hopefully increase local support for any changes that need to take place. For this project, stakeholder analysis could look something like this:

 

1. Stakeholder Identification

Potential stakeholders might come from any of the following groups:

  • Members of the community
  • Environmental groups
  • Regulators and governments
  • Banks & investors
  • Suppliers
  • Collaborators
  • Energy users
  • Other local businesses
  • The fossil fuel industry
  • Members of the public

 


2. Stakeholder Assessment

Interest, Impact, Power, Attitudes, etc.

An assessment might reveal that certain stakeholders (especially nearby residents and local business users within the farm area) were likely to see a high impact on the project and may feel negatively towards it.

Some environmental groups may feel negatively and others positively — depending on their perspectives and goals.

Suppliers and collaborators may have a significant impact on the project outcomes.

Meanwhile, other stakeholders (members of the public, energy users, and the fossil fuel industry) may have less of an impact on the project — but still be interested in it.

Relationship network mapping may reveal that certain stakeholders within any of these groups are more connected and influential than others.

 


3: Stakeholder Grouping

By priority, shared interests, similar attributes, etc.

Depending on the outcomes of the stakeholder assessment, the project managers may group the stakeholders by priority (and communication frequency).
  • Priority 1: Local businesses, community members, suppliers
  • Priority 2: Environmental groups, regulators/governments, collaborators, banks/investors
  • Others: Energy users, members of public, fossil fuel industry

 


4. Apply the Insights

Use in stakeholder planning, activities, and reporting

Priority 1 stakeholders should be offered a variety of engagement methods to increase their participation. This may include face-to-face visits, events, phone calls, and individual interviews.

Priority 2 stakeholders should be offered regular engagement opportunities, such as events, surveys, updates, and more.

Other stakeholders may be offered regular updates via email or SMS, as well as opportunities to provide feedback via surveys.

 


Learn more about this area in our blog on Who are the Stakeholders in Offshore Wind Energy Projects?

Stakeholder Analysis for a New Highway Development

Stakeholder analysis will likely be a critical step (and ongoing necessity) for the new Caboolture West / Waraba development in South-East Queensland — especially with the planned Bruce Highway Western Alternative.

The stakes are high when it comes to major developments like this, with many varying levels of impact, influence, and competing interests. Stakeholder analysis can help with anticipating objections, managing expectations, minimizing risk, and ensuring the smoothest possible path to project completion. Here’s what we imagine that process might look like:

1. Stakeholder Identification

Potential stakeholders might come from any of the following groups:

  • Local residents and homeowners
  • Farmers and primary producers
  • Local businesses
  • Community groups
  • Environmental groups
  • Public transport providers and users
  • Local schools
  • Local medical facilities
  • Emergency service providers
  • Commuters in adjoining suburbs
  • Truck drivers
  • Contractors
  • Banks/creditors
  • Council members & other levels of government
  • Regulators

 


2. Stakeholder Assessment

Interest, Impact, Power, Attitudes, etc.

From an assessment, you might discover that the groups most impacted are the local residents, homeowners, and farmers whose land may be purchased to make way for the development — and those who might find themselves living on a main road.

But any local businesses, schools, and facilities may find their services disrupted due to the development.

At this point, it’s also critical to note down any groups that may be particularly disadvantaged and marginalised.

 


3: Stakeholder Grouping

By priority, shared interests, similar attributes, etc.

Depending on the outcomes of the stakeholder assessment, the local council may group the stakeholders by the type of communication they may need to receive and the level of participation required.
  • Priority 1: Local residents, homeowners, farmers, and businesses in the direct path of the new highway
  • Priority 2: Other residents, businesses, school, and facilities in the nearby area, emergency services, as well as drivers and public transport users that rely on local roads
  • Others: Environmental groups and community groups

 


4. Apply the Insights

Use in stakeholder planning, activities, and reporting

Priority 1 stakeholders will need to be consulted with early and often — taking into account the potential impacts and minimizing these where possible.

Priority 2 stakeholders will need to be informed about any disruptions to their commute and business, and encouraged to provide feedback about the route.

Other stakeholders will mainly need to be kept informed, but may also benefit from some involvement in the process to help inform decision-making.

 


Stakeholder Analysis for Government Policy Change

Stakeholder analysis is an important tool for policy making that can play a role in successful implementation. Policymakers must identify the stakeholders in relation to a policy — along with their interests, importance, and potential knowledge. In some cases consultation may even be required in order to create or change policy. But in any case, beginning with stakeholder analysis can help to anticipate and avoid potential misunderstanding and opposition.

1. Stakeholder Identification

Potential stakeholders might come from any of the following groups:

  • Community members & local residents
  • Council members
  • Researchers & academics
  • Committee members

Plus, any groups that the policy might directly impact. For instance, health policy might impact patients, sick people, carers, and insurers. Housing policy may impact landlords, renters, investors, real estate companies, and banks. Economic policy would likely impact businesses, investors, and taxpayers — some more than others. Education policy may impact teachers, students, and parents — and future employers.

 


2. Stakeholder Assessment

Interest, Impact, Power, Attitudes, etc.

Assessing stakeholders would soon reveal the different stakeholder perspectives on the proposed program or policy, including who it impacts, who may influence it, and differing interests and attitudes.

Most of the time, a policy change will have “winners” and “losers” and the assessment should make it possible to identify who these might be.

 


3: Stakeholder Grouping

By priority, shared interests, similar attributes, etc.

Grouping policy stakeholders might happen depending on the level of involvement you expect, for instance, inform, consult, involve, collaborate, or empower. Or you may group them based on shared interests — as these groups will likely need to receive similar information and opportunities to engage.

 


4. Apply the InsightsUse in stakeholder planning, activities, and reporting Whatever insights you gained from the stakeholder analysis process, these should be used to plan the policy or program, and the corresponding engagement activities.

 


Learn more on this topic in our previous blogs, 4 Examples of Stakeholder Engagement In Policy and Policy Consultation & the Importance of Stakeholders.

Common Mistakes with Stakeholder Analysis

Want to avoid the common mistakes? Our team has been in the stakeholder management industry for several decades now. In that time, we’ve found that organizations consistently trip up with their stakeholder analysis in the following areas:

1. Only Doing Stakeholder Analysis at the Start

While starting with stakeholder analysis is a smart move, it’s important to revisit your stakeholder list regularly to keep it updated and monitor for change.

2. Only Using One Stakeholder Mapping Method

While the Power/Interest Grid is a popular method, it’s not a perfect framework. It’s a good idea to use multiple methods to give you a more complete analysis of your stakeholders (check out our article covering 15 different stakeholder diagrams if you’d like some ideas or inspiration!).

We’re fans of the multidimensional stakeholder mapping method: Interest, Influence, Impact, Criticality, Effort, and Position.

3. Not Assigning Resources

Depending on the complexity of your project and volume of stakeholders, it can take significant resources to properly analyze stakeholders. Too many teams don’t set aside enough time or suitable software to support the process. Software like Simply Stakeholders can help reduce the amount of time that goes into analyzing stakeholders upfront — as well as making it easy to update the insights throughout the engagement.

Learn more in our article on 6 Ways Stakeholder Management Software Delivers ROI.

4. Not Analyzing Stakeholders as a Team

If you work as a team but assign stakeholder analysis to one individual team member, you’re missing valuable opportunities to incorporate everyone’s insights into the analyses. On top of this, you forego the chance to get everyone on the same page and have conversations about how important and influential your stakeholders really are — and these insights should influence the direction of your project.

5. Not Using the Insights

Identifying and mapping your stakeholders is a useful exercise that requires time and effort. So maximize the value you get from the insights by using them to shape discussions and develop plans, strategies, and reports.

See more details in our blog on stakeholder analysis mistakes.

Introduction to Advanced Stakeholder Analysis Concepts

We’ve kept this guide super simple, but if you’re looking to expand your knowledge with more advanced concepts and ideas, you might like to explore the following topics.

Stakeholder Relationship Mapping

While we looked at mapping stakeholders based on their attributes, we haven’t discussed stakeholder relationships in great detail. Stakeholder relationships are an important consideration for your stakeholder analysis — when you know who you’re connected to and who they’re connected to, you can make more strategic decisions that help you more effectively engage with the right stakeholders at the right time. The reason we consider this an advanced concept is because mapping stakeholder relationships can take a lot of time and effort (though it’s well worth doing!).

Stakeholder Analysis & Bias

We’re not referring to stakeholder biases (which you may uncover through stakeholder analysis), but the biases you and your team may hold.

Good stakeholder analysis requires you to be as objective as possible, but this is easier said than done.

Bias can occur at any point during stakeholder analysis for a number of reasons:

  • You don’t know what you don’t know (which limits your stakeholder identification)
  • Concepts like ‘power’ and ‘interest’ can be hard to define
  • Your own experiences could inform how you group stakeholders and the issues you focus on.

Stakeholder Privacy

Privacy is an important consideration any time you collect data on stakeholders. This means following the relevant local laws, ensuring your platforms are secure, making sure you have the correct permissions, and managing how your team uses and shares information.

FAQs

Q1. What is stakeholder analysis in project management?

Stakeholder analysis in project management is the process of identifying every individual, group, or organisation that has an interest in, influence over, or is affected by a project — then assessing their level of interest and influence to determine how to engage with them. It is typically carried out at the start of a project (and revisited throughout) to reduce risk, build stakeholder support, align expectations, and prioritise communication efforts. The output of a stakeholder analysis informs the broader stakeholder management plan.

Q2. What are the steps of stakeholder analysis?

Stakeholder analysis typically follows four key steps. First, identify your stakeholders by brainstorming all individuals and groups involved in or affected by the project. Second, analyse each stakeholder’s level of interest (right to be involved) and influence over the project. Third, map or visualise your stakeholders using a framework such as the 3i model. Fourth, prioritise and plan your engagement strategy, tailoring your communication approach to each stakeholder group based on where they sit on your map.

Q3. What is the difference between stakeholder analysis and stakeholder mapping?

Stakeholder analysis is the broader process of identifying who your stakeholders are, understanding their interests and influence, and planning how to engage with them. Stakeholder mapping is one specific step within that process — it involves creating a visual representation (such as a matrix or diagram) that plots stakeholders based on criteria like influence, interest, impact, criticality. In short, stakeholder mapping is a tool used during stakeholder analysis, not a separate process.

Q4. What is a stakeholder analysis matrix?

A stakeholder analysis matrix is a visual tool, that plots stakeholders based on two or more criteria — most commonly their level of power (or influence) and their level of interest in the project. Older salience type of models used a 2 x 2 matrix with power and impact (or similar combinations). Modern stakeholder matrices are multi-dimensional, including up to 6 criteria as well as other factors such as role, contact grouping, demographic information etc.

Q5. How do you identify key stakeholders?

To identify key stakeholders, start by listing everyone who could be affected by, have an influence on, or hold an interest in your project. This includes internal stakeholders (such as team members, executives, and department heads) and external stakeholders (such as customers, community members, regulators, and suppliers). Common identification methods include brainstorming with your project team, reviewing organisational charts, analysing previous similar projects, consulting subject-matter experts, and reviewing legal or regulatory requirements. Once listed, assess each stakeholder’s mapping values such as level of influence and interest to determine which ones are “key” — meaning they require closer management and more frequent engagement. Stakeholder mapping is a great way to identify gaps in your stakeholder lists.

Q6. Why is stakeholder analysis important?

Stakeholder analysis is important because it helps you understand who can influence your project’s success and who will be affected by it. By identifying stakeholders early, you can build support from key decision-makers, anticipate and manage resistance, allocate resources more effectively, tailor communication to different audiences, and reduce the risk of project delays or failure caused by overlooked stakeholders. It also supports compliance with consultation and engagement obligations, which is particularly relevant in sectors like infrastructure, energy, and government where formal stakeholder engagement is often required.

Q7. When should you conduct a stakeholder analysis?

Stakeholder analysis should ideally be conducted at the very beginning of a project, during the planning or initiation phase, before key decisions are made. However, it is not a one-off exercise. Stakeholder interests, influence, and attitudes change over time, so the analysis should be revisited at major project milestones, when the project scope changes significantly, when new stakeholders emerge, or when engagement issues arise. For long-running projects, a six-monthly review of your stakeholder analysis is good practice.

Q8. What tools can you use for stakeholder analysis?

Common tools for stakeholder analysis include the power/interest matrix, the salience model, RACI matrices, stakeholder registers (spreadsheets listing stakeholder details), and influence/impact grids. For visualisation, stakeholder maps, Venn diagrams, and network relationship diagrams are widely used. Many teams start with spreadsheets or templates, but as projects grow in complexity, dedicated stakeholder relationship management (SRM) software offers advantages including automated analysis, sentiment tracking, built-in mapping, and centralised data management. The best tool depends on your project’s size, complexity, and the number of stakeholders involved.

Easy Stakeholder Analysis with Simply Stakeholders

Illustration of a man looking at a chart.

Simply Stakeholders is a smart (but simple) stakeholder relationship management tool that makes it easier than ever to analyze your stakeholders and visually map them based on 6 different criteria, as well as your stakeholder relationships.

Not only that, but our built-in AI-powered sentiment analysis enables up-to-date insights on your stakeholders throughout the entire project.

Interested in learning more? Take a look at our other features or contact us to request a demo.

]]>
Stakeholder Management: The Ultimate Guide (2026) https://simplystakeholders.com/resources/guides/stakeholder-management/ Wed, 21 Aug 2024 11:23:25 +0000 https://dev.veribo.ro/simply-new/?post_type=guide&p=533

Stakeholder management is the systematic process of identifying, understanding and building relationships with people and organisations that can affect, or who are affected by, a project, policy of work of an organisation. It involves analysing stakeholder needs, interests, influence and relationships; planning appropriate engagement; recording the engagement including monitoring issues and sentiment; and adapting your strategy as circumstances change.

Stakeholder management is an important process for governments and organizations all over the world. In this guide, we share stakeholder management definitions, why it matters, processes, best practices, and more.

Effective stakeholder management isn’t about controlling stakeholders; it’s about developing the understanding and relationships required to make better decisions, manage risks and achieve better outcomes.

Whether you’re just starting to take a strategic approach with managing stakeholders or you’re an executive or consultant with decades of experience, we hope you’ll come away with plenty of value in the form of clarity, ideas, and resources you can explore further.

What is Stakeholder Management?

Stakeholder management is defined as the process by which you organize, monitor, and improve your relationships with your stakeholders. Usually this involves identifying stakeholders, analyzing their needs and expectations, and then planning and implementing various tasks to engage with them. This will allow you to coordinate your interactions and assess the quality of your relationships so that you can achieve an outcome, legal requirement, or strategic benefit.

You might also hear stakeholder management referred to as stakeholder engagement, community engagement, public consultation, civic engagement, public participation, and several other terms. There are some subtle differences between these terms, how they’re used, and preferences in different jurisdictions, but they each have very similar processes.

Learn more about what stakeholder management is.

Stakeholder management vs stakeholder engagement

Stakeholder management is the broader organisational process of identifying, analysing, mapping, recording and monitoring stakeholder relationships.

Stakeholder engagement is the actual process of communicating, consulting, listening and interacting with those stakeholders.

What’s a Stakeholder? Stakeholder refers to any people or groups who are impacted by a project, initiative, policy or organization.

Read more about what stakeholder means.

What Isn’t Stakeholder Management?

Sometimes you’ll come across other definitions of stakeholder management that focus on the idea that you can create a plan to manage your stakeholders in order to get them to do what you want. But this is a common misconception.

Although stakeholder management can help you achieve various legal and strategic objectives, the stakeholder management process isn’t designed to influence or control people. It isn’t marketing and it isn’t public relations.

So, in this guide, we’re going to show you how you can achieve objectives like meeting your legal requirements and gaining strategic advantages through stakeholder management.

Why is Stakeholder Management Important?

Stakeholder management is important because project and organisational outcomes increasingly depend on the quality of relationships with the people who affect, or are affected by, decisions. Effective stakeholder management helps organisations understand expectations, identify risks and opportunities earlier, build trust, make better decisions and reduce the likelihood of conflict, delays and loss of social licence.

Stakeholder management forms the framework within which stakeholder engagement operates. Without a clear sense of who your stakeholders are, their needs and concerns, an understanding of what the objectives of the engagement are and how you will evaluate it, all key parts of stakeholder management, the engagement itself can feel tokenistic and lacking in purpose.

The Benefits of Stakeholder Management

A group of stakeholders gathered in a room and watching a presentation.

Stakeholder management is an important process for many organizations and projects, and has a range of benefits and use cases. For instance:

  • Running a successful project — Managing stakeholders (and doing it well) can help you develop and maintain good relationships with the communities who will be affected, along with other stakeholders.
  • Supporting stakeholder engagement – By first identifying stakeholders and assessing their interests, you can create a firm foundation on which to build your stakeholder engagement strategy.
  • Meet legal obligations – With increasing legislation around privacy protections and the right to information, it’s even more important than ever that organizations or projects have a clearly defined stakeholder management plan and protocols.
  • Manage expectations – With community expectations higher than ever (and still rising), organizations can benefit from greater understanding and careful management.
  • Manage risks – Managing stakeholders in a systematic, controlled way can help to identify, mitigate, and avoid a range of risks associated with your organization or project.
  • Gain a social license – The stakeholder management process can help to identify opportunities that allow you to gain a social license to operate.
  • Build social capital – Because social capital requires relationships to generate value, managing stakeholders effectively can accelerate the growth of your social capital.
  • Improve reputation – Through the stakeholder management process, your organization can build relationships with key stakeholders and improve your reputation on specific issues, like transparency and sustainability.
  • Greater business intelligence – Understanding stakeholder concerns and interests can lead to ideas for products or services that will address stakeholder needs or allow the company to reduce costs and maximise value.
  • Align business goals – Seeking to understand your stakeholders while communicating your business goals can help you better align with stakeholders.
  • Increased stakeholder support – Stakeholder management can sometimes lead to greater support by improving communication, increasing transparency, and building trust.
  • Reduce delays – Strategically managing stakeholders can allow you to quickly provide information and request feedback, and stakeholder insights and cooperation can help to reduce potential project delays.
  • Improved sustainability – Managing and engaging with stakeholders delivers insights that are key to sustainable decision making.
  • Support corporate governance – Through the stakeholder management process, you can identify and manage a range of demands and expectations from various governing groups and stakeholders.
  • Gain a competitive advantage – Any organization can gain a competitive advantage by more effectively understanding their stakeholders, identifying opportunities, and uncovering potential risks.

Infographic showing 6 benefits of stakeholder management

The Stakeholder Management Process

Infographic showing the steps in stakeholder management

So, what does a deliberate, strategic approach to stakeholder management actually look like? Generally, you could break it down into four main steps:

Understand Your Stakeholders

The key to a successful stakeholder management program is to start with a good understanding of your stakeholders. And make sure you are testing and refining that understanding throughout the process.

After identifying stakeholders, begin your stakeholder analysis by considering and making note of:

  • Other information – What other information can you collect on stakeholders that will help you understand their needs, priorities, preferences and concerns?
  • Demographics – Based on demographic data, are you engaging with a broad cross-section of the community and stakeholder groups?
  • Social networks – Are you focusing on the important, yet often undocumented, social connections between stakeholders?
  • Salience – Have you considered using the Salience Model to examine the power, urgency (need for immediate action) and legitimacy (appropriate stakeholders) — and the interaction or groups of stakeholders this creates?
  • Expectations – What are the stakeholder expectations and how do they compare with the scope and expectations of the project or organization? Is there a gap or mismatch? If so, how will this be managed?
  • Preferences – What information do stakeholders want from you, how often, and in what format/channel?
  • Interests – What financial/social/emotional interest do they have in the outcome of your work? Is it positive or negative?
  • Motivations – What are the key motivations that will drive their perceptions of your project or organization and their interactions with you?
  • Opinions – What is their current opinion of your organization and project? Is it based on good information?
  • Influences – Who influences their opinions? Who do they influence, in turn?

Five questions you should be able to answer:

  1. WHO are they? – Role, organisation, community, demographics, location, group.
  2. WHAT matters to them? – Needs, interests, expectations, concerns, issues.
  3. HOW are they affected? – Impact, interest, benefits, risks.
  4. WHO influences them? – Relationships, networks, connections, influence.
  5. WHERE do they currently stand? – Position, sentiment, trust, relationship quality.

Stakeholder Mapping

To continue your stakeholder analysis, it’s helpful to ‘map’ or visualize your stakeholders in relation to other key stakeholders and key criteria. This will enable you to strategize how you will prioritize and approach either individual, organization, or group of stakeholders.

What is stakeholder mapping?

Stakeholder mapping is a term often used to describe the process of assigning values that shape priorities and strategies for each stakeholder, based on their ranking against some set criteria. Sometimes stakeholders are simply assigned a rank (of low-medium-high or 1-5) against each criteria. Often they are plotted on a matrix to provide a visual depiction of the range of stakeholders in your program. After you have ranked your stakeholders or plotted them on these matrices, you next need to consider how this information will influence your stakeholder management plan and strategy.

Common stakeholder mapping methods

There are a number of standard frameworks used for stakeholder mapping:

  • Salience Model
  • Stakeholder Knowledge Base Chart
  • Power/Interest Grid
  • Power/Predictability Matrix
  • Stakeholder Relationship Mapping
  • Stakeholder Mapping Spreadsheets
  • Multi-Dimensional Stakeholder Mapping

We cover these frameworks and methods in detail in our blog on stakeholder mapping. But you can also preview many of these below:

Salience Model for stakeholder mapping. Key to interpreting the stakeholder mapping salience model. Stakeholder knowledge base chart. Power-Interest Grid for stakeholder mapping. Power-Predictability Matrix for stakeholder mapping. Example stakeholder relationship mapping network diagram. Example of spreadsheets used for stakeholder mapping.

At Simply Stakeholders, we take a multi-dimensional approach to stakeholder mapping inside our stakeholder software.

The limitation of static stakeholder maps

Some of the ‘industry standard’ grids are a bit dated and don’t take into account shifting power relationships and stakeholder expectations (especially with easy access to social media and the risk-averse nature of governments when it comes to political damage). It’s important to take this into account when selecting a framework or model to ensure that you can fully understand your stakeholders and ensure your strategy caters to all their needs.

Stakeholders change. Their influence changes. Their position changes. Their relationships change. Their sentiment changes. So a stakeholder map shouldn’t be a workshop artifact created at the beginning of the project and then forgotten.

The Simply Stakeholders approach to stakeholder mapping

Our approach to stakeholder mapping includes:

  • Segmentation based on influence, interest, impact, position, effort and criticality
  • Mapping connections between stakeholders in a visual network relationship map
  • Custom fields to track additional information such as demographics
  • The multi-dimensional method (our preferred method) so that you can map on a scale from very low to very high for the criteria of:
Influence

The level of influence a stakeholder has over the project

Interest 

The right of the stakeholder to be consulted and involved in the decisions.

Impact 

The level of impact the stakeholder has on the project.

Criticality

How critical is this stakeholder to the success of the project?

 

Effort

How much effort would it take to genuinely engage this stakeholder?

 

Position

The current position of this stakeholder towards this project

 

Importantly, our software also tracks how these stakeholder mapping values change over time.

Stakeholder Relationship Mapping

Conventional stakeholder analysis focuses on the attributes of individual stakeholders. Relationship mapping adds another layer, answering the question:

How are stakeholders connected?

This introduces considerations such as:

  • who influences whom?
  • who are the connectors between stakeholder groups?
  • which relationships are strong or weak and how are they changing?
  • which influential stakeholder have weak relationships with us?
  • where are there relationship dependencies?
  • where are the gaps in our organisational network?

Comparing individual mapping to relationship mapping

Create a Stakeholder Management Plan

A stakeholder management plan is a document that outlines appropriate management strategies to effectively engage stakeholders throughout the lifecycle of the project, based on the analysis of their needs, interests, and potential impact on the project’s success.

Your stakeholder management plan will include some of the information you’ve gathered from earlier steps in the process, as you identified, analyzed, and organized your stakeholders. But before you jump into creating your plan, start by asking the following questions:

  • What are the strategic reasons for consulting with stakeholders at this stage?
  • Who needs to be consulted?
  • What are the priority issues (for them and for you)?
  • What will be the most effective methods of communicating with stakeholders?
  • Who within the company is responsible for what activities?
  • Are there any other engagement activities that will occur in the proposed time frame (perhaps with other sections of your organization)?
  • Are there opportunities to collaborate to ensure key project messages are consistent and avoid consultation fatigue?
  • How will the results be captured, tracked, reported, and disseminated?

It’s important to be strategic and clear about who you are engaging with (and why) before you get too far into the process. This will not only help to save time and money, but also help you manage expectations and gain trust.

Here are 5 components that should make up your stakeholder management plan: 

1. Identify Stakeholders

Icon of people
  • Who are your stakeholders?
  • What are their key groupings and sub-groupings?

Remember — not all stakeholders in the same group will necessarily have unified opinions or priorities.

2. Analyze Stakeholders

Magnifying glass icon
  • What are stakeholder group interests?
  • How will they be affected, to what degree?
  • What influence could they have?

Include any other information to help better understand stakeholder needs, priorities, and issues.

3. Strategize and Prioritize

Lightbulb icon
  • What are the strategic reasons to engage with stakeholders?
  • What is the approach to each stakeholder group?
  • What are your priority stakeholders and why?

Consider the most appropriate ways to engage with each group.

4. Assign Responsibilities

Collaboration icon
  • Who within the company is responsible for what activities?
  • Are there any overlapping activities that present an opportunity for collaboration?

Consider the roles and requirements for stakeholder management.

5. Monitor and Report

Analytics and monitoring icon
  • How will the activities and results be captured, tracked, reported, and disseminated?
  • How and when should you update the plan with interests and priorities changing over time?

Consider who you should report to, when you should report, and what you should report on.

We have quite a few resources that can help you put together your stakeholder management plan, including:

Or jump straight into our online tool to create your stakeholder management plan in just 15 minutes:

Online Tool: Create a Stakeholder Management Plan

Implementing Your Stakeholder Strategy

A stakeholder plan creates value when interactions, issues, commitments and outcomes are consistently captured.

Four things teams should record as part of their stakeholder engagement processes:

  1. Interactions – include enough detail in here to include what was discussed (not just that a meeting was held). Without sufficient data in each record, it is difficult to do any meaningful analysis of issues, sentiment, risks, opportunities and trends.
  2. Issues – some systems like Simply Stakeholders will automatically analyse the issues and tag them in interactions. In other systems, make sure you consistently tag and track issues and have a robust issues register maintained.
  3. Commitments – what promises were made and to whom?
  4. Outcomes – what changed as a result of your engagement?

Illustration of a man writing on a chart.

Once your stakeholder management plan is in place and you’ve gained acceptance from your colleagues, executive team, and other relevant stakeholders in your organization, it’s time to implement it.

This means putting in place the tools, communications, activities, and other strategies and resources you’ve identified to manage your stakeholders. Plus, ensuring that the other responsible people implement their assigned activities and tasks.

Monitoring Stakeholder Relationships Over TimeImplementing your current plan is just the beginning. Throughout the implementation, you should monitor your stakeholders to see how they respond to the strategies and check whether you’re meeting the objectives of your plan, project, and organization. Regular reports are important so that you can keep the relevant people in the loop — and track how your plan is progressing.

Monitoring and reporting will often reveal opportunities to improve your processes — new insights into stakeholders, feedback, changing expectations, emerging issues, and changing sentiments. As you learn new things about your stakeholders, use this as an opportunity to adjust your stakeholder management strategies.

Activity

How many meetings did we have?

Engagement

Who did we hear from?

Understanding

What are stakeholders telling us?

Relationship

How are relationships changing?

Strategic insight

What should we do next?

Advanced Stakeholder Management Tips 

We’ve already covered some basic processes and plans you can follow to get started with stakeholder management. But let’s dive a little deeper into some best practices and more advanced tips you can apply to help you achieve the best possible outcomes.

Get Compliant

With increasing legislation and concerns around privacy and the use of personal data, it’s more important than ever to have clear, well documented processes for your stakeholder management.

For instance, if you are working in or providing services to the European Union and the United Kingdom, you must take particular note of the GDPR requirements that came into play in May 2018. Most other countries have also increasingly tightened requirements for:

  • Legitimacy – What data you can legitimately collect and store
  • Permissions – How you seek permission for collecting that data
  • Usage – How you use that data, and whether it is for a legitimate purpose and consistent with the reasons you gave for collecting the data
  • Storage location – Where you store that data and the location of any people who need to access that data
  • Security – What security measures you have in place to protect that data
  • Requests – Making it easy for the public to request a copy of the data you store on them, and providing it in a machine-readable format

Be Comprehensive

After identifying your stakeholders, review your stakeholder lists to ensure they genuinely represent the whole range of stakeholders. Your needs assessments and engagement programs are all dependent on you having up-to-date and representative stakeholder lists, so make a note to check for comprehensiveness on a regular basis.

Be Honest and Transparent

Honesty is the best policy with stakeholder management! Be honest about why and how you gather information from stakeholders, including social media tracking (going above and beyond the legislated requirements).  Be transparent about what you are collecting, why, and what you plan to use the data for.

Segment Stakeholders

After analyzing and mapping your stakeholders, segment them into lists to help you provide a more relevant, tailored stakeholder experience. You could slice your list by a variety of attributes, including location, demographics, industry, interest, needs, influence, and impact.

Another benefit of this is that you can gain insights into how specific stakeholder groups are responding to your communication and activities. And you can make sure you’re reaching the right people with the right message at the right time.

Evaluate Your Plan

Evaluation is an important part of stakeholder management but too many organizations don’t do this well. In particular, you should evaluate whether your plan was successful based on pre-defined measures of success. We talk about this inside our eBook on evaluating stakeholder engagement and public consultation and our webinar on how to evaluate your stakeholder engagement.

Audit Your Data Processes

Regularly audit your data management processes to ensure they’re appropriate, compliant, and efficient. Check that the metrics you’re gathering are fair — to ensure that your conclusions and recommendations accurately represent stakeholder views and requirements.

Another issue to consider is whether you’re keeping your stakeholder system up-to-date. Encourage your team to regularly add new stakeholders to your lists and ensure all interactions are automatically or manually added to the system. The sooner data is added, the less likely it’ll be missed or forgotten.

It’s also a good idea to run maintenance on your data to clean it up. Look for duplicate stakeholder records and merge them. Or (ideally) use a stakeholder management system that allows for sophisticated cross-project stakeholder sharing to minimize stakeholder list duplication and keep your data squeaky clean.

Set Up Shared Stakeholder Lists

Stakeholder management is a huge task — and one best shared with your team. So, make sure that your contact list is in a format that’s easy to share, and allows multiple to work on it simultaneously. The problem that so often occurs with spreadsheets is that you end up having issues with version control and information spread across multiple places. Once you are working inside an SRM like Simply Stakeholders, you can be confident that all users with permission have access to the latest and most up-to-date list.

Of course, be aware of privacy and other legislation around the use of personal information —make sure you are still compliant with the legislation in your country.

Collect the Right Information Right From the Start

From the start of your stakeholder management process, consider what information you might need from stakeholders in future in order to contact them and gather meaningful insights. For example, if you have a signup form on your website, ensure you include all the fields that are important to track. For example, a postcode or area code can allow you to tailor your insights and communication to very specific locations.

This will save you time gathering information manually, and give you richer information on each stakeholder — above and beyond just their name and email address.

Of course you do need to balance this against form best practices, ensuring that you don’t end up with a form that’s so long that most stakeholders won’t complete it.

Manage Grievances

Grievance and complaints handling is an important part of stakeholder management in most organizations. A well-functioning grievance mechanism provides a transparent, credible, and fair process to all parties. It enhances outcomes and gives people the satisfaction that their complaints have been heard, even if the outcome is less than optimal.

A good complaint handling process helps build trust as part of the broader community relations activities and contributes to the overall success of the company’s social performance.

Get Inspired and Think Outside the Box

When creating your stakeholder management plan and deciding on what activities you should include, think outside the box — and consider new, tech-enabled methods that may not have been previously available. Explore case studies, academic papers, new platforms, and data capabilities to see what’s possible!

International standards and stakeholder engagement frameworks

Stakeholder management and engagement practices are supported by a number of international standards and frameworks. These include ISO 26000 Guidance on Social Responsibility, the AA1000 Stakeholder Engagement Standard, the OECD Guidelines for Multinational Enterprises on Responsible Business Conduct, the Global Reporting Initiative (GRI) Standards, and, for organisations delivering major projects, the IFC Performance Standards and Stakeholder Engagement Good Practice Handbook.

While these frameworks have different purposes, they share several principles: identify affected stakeholders, understand their interests and impacts, engage meaningfully, maintain two-way communication, respond to stakeholder input and integrate stakeholder insights into organisational decision-making.

Best Practice Stakeholder Management

Good stakeholder management is more than maintaining a stakeholder list or recording meetings. It is an ongoing process of building understanding, managing relationships, identifying emerging issues and using stakeholder intelligence to make better decisions.

Effective stakeholder management should also be informed by recognised stakeholder engagement frameworks. The AA1000 Stakeholder Engagement Standard, for example, provides a widely used framework for planning, preparing, implementing and improving stakeholder engagement.

While every organisation and project is different, there are some principles that consistently underpin effective stakeholder management.

10 principles of effective stakeholder management

1. Be clear about your purpose

Start by understanding why you are engaging stakeholders and what you need to achieve. Your approach will be different if your goal is to understand community concerns, build support for a project, meet regulatory requirements, resolve an issue or maintain important long-term relationships.

Clear objectives make it easier to identify the right stakeholders, choose appropriate engagement methods and determine what information you need to capture.

2. Identify stakeholders comprehensively

Look beyond the most visible or powerful stakeholders. Consider anyone who can affect your organisation or project, anyone who may be affected by it, and people or organisations with an interest in the outcome (think of this as people who have a statutory, cultural, social or economic “right to be consulted”).

Stakeholder identification should also be ongoing. New stakeholders may emerge as projects, issues and communities change.

International guidance such as ISO 26000 also recognises stakeholder identification and engagement as fundamental practices of organisational social responsibility.

3. Understand what matters to your stakeholders

Knowing who your stakeholders are is only the beginning.

Effective stakeholder management requires an understanding of their interests, needs, expectations, concerns, motivations and priorities. You should also consider how they are affected by your activities, how much influence they have, their current position and who may influence them.

This deeper understanding allows you to engage stakeholders based on what actually matters to them rather than relying on assumptions.

4. Understand relationships, not just individual stakeholders

Stakeholders don’t exist in isolation. They belong to communities, organisations and networks and may influence each other’s opinions and behaviour.

Understanding these relationships can reveal influential connectors, important networks, potential allies, relationship gaps and areas where issues could spread.

You should also understand the relationships between stakeholders and people within your own organisation. An important stakeholder may have several relationships across your organisation, or none at all.

Meaningful engagement is more than communicating information. The OECD Guidelines for Multinational Enterprises on Responsible Business Conduct describe meaningful stakeholder engagement as an ongoing, two-way process conducted in good faith and responsive to stakeholder views.

5. Prioritise intelligently

Not every stakeholder requires the same level or type of engagement.

Stakeholder mapping can help you prioritise based on factors such as influence, interest, impact, position, relationship quality, salience or strategic importance.

But avoid treating a stakeholder’s position on a map as permanent. Influence, interest, sentiment and relationships can change, sometimes rapidly. Prioritisation should therefore be reviewed as new information becomes available.

6. Maintain a shared source of truth

Stakeholder knowledge shouldn’t live in individual inboxes, spreadsheets, meeting notes or people’s memories.

Maintain a central stakeholder record that brings together important information about stakeholders, relationships, interactions, issues, commitments and outcomes.

This creates organisational memory, improves coordination and reduces the risk of important stakeholder intelligence disappearing when team members change roles or leave.

7. Record engagement consistently

Recording that a meeting occurred isn’t enough. Where appropriate, capture what was discussed, issues or concerns raised, commitments made, stakeholder sentiment, important changes and agreed next steps.

Consistent records make it possible to understand the history of a relationship and identify patterns across many interactions and stakeholders.

8. Protect stakeholder information

Stakeholder information can be sensitive. Collect information for a clear and legitimate purpose, be transparent about how it will be used, and avoid collecting information simply because you can.

Appropriate privacy, security, permissions and data-governance practices should be built into your stakeholder management process, especially in relation to where and how the data is stored and secured, and how it is used.

9. Measure outcomes, not just activity

Counting meetings, emails, events and consultation responses can tell you how much engagement has occurred. It doesn’t necessarily tell you whether that engagement was effective. Look beyond activity measures to understand changes in stakeholder sentiment, relationships, issues, trust, support, risk and outcomes.

The more important question is not simply “How much engagement did we do?” but “What changed as a result?”

10. Learn and adapt

Stakeholder management should never be static. Monitor changes in stakeholder priorities, relationships, influence, sentiment and emerging issues. Use what you learn from engagement to adjust your strategy and, where appropriate, influence organisational or project decisions.

For major projects, stakeholder engagement should continue throughout the project lifecycle rather than being treated as a one-off consultation exercise. The International Finance Corporation’s Stakeholder Engagement Good Practice Handbook provides practical guidance on integrating stakeholder engagement from project concept and planning through construction, operations and eventual decommissioning.

The strongest stakeholder management programs create a continuous cycle:

Listen → Understand → Act → Monitor → Learn → Adapt

This turns stakeholder management from an administrative process into a source of strategic intelligence.

How AI is Changing Stakeholder Management

Stakeholder teams have traditionally faced a difficult problem: they collect large amounts of valuable information through meetings, emails, phone calls, consultation activities, surveys and other interactions, but analysing all of that information consistently can be difficult and time-consuming.

As a result, important stakeholder intelligence can remain buried in individual interaction records, spreadsheets, documents and people’s memories.

AI is beginning to change this.

Used appropriately, AI can help organisations analyse large volumes of qualitative stakeholder information, identify patterns and turn engagement records into insights that are easier for teams and decision-makers to use.

From stakeholder records to stakeholder intelligence

The evolution of stakeholder reporting can be thought of as a maturity curve:

Descriptive → Diagnostic → Strategic → Predictive → Prescriptive

Descriptive — “What happened?”

Traditional stakeholder reporting often focuses on activity: meetings held, stakeholders contacted, issues recorded or consultation responses received.

AI can help summarise this information quickly and consistently.

Diagnostic — “What changed and why?”

The next level is understanding changes across the data.

Are particular issues being mentioned more frequently? Has stakeholder sentiment shifted? Are concerns concentrated among particular stakeholder groups, communities or locations?

AI can help teams identify these patterns across many interactions.

Strategic — “What matters?”

Not every issue or stakeholder interaction deserves the same level of management attention.

By analysing issues, relationships, stakeholder characteristics, sentiment and engagement history together, AI can help surface the themes, stakeholders and changes that may be most significant.

Predictive — “What appears to be emerging?”

When stakeholder information is captured consistently over time, patterns may provide early signals of emerging risks, opportunities or changes in stakeholder attitudes.

AI can help identify these signals earlier than manual review alone, although they should be treated as indicators for further investigation rather than certain predictions.

Prescriptive — “What should we do next?”

The most advanced use of stakeholder intelligence is to support decisions.

Which relationships need attention? Which issues warrant escalation? Where might further engagement be valuable? Which stakeholders or communities are we not hearing from?

AI can help decision-makers identify where attention may be required and evaluate possible next steps.

Practical uses of AI in stakeholder management

Depending on the quality and structure of the underlying stakeholder data, AI can assist with tasks such as:

  • summarising stakeholder interactions and engagement histories
  • analysing sentiment across qualitative feedback
  • identifying recurring and emerging issues
  • detecting themes across large volumes of engagement data
  • summarising the history of a stakeholder relationship
  • identifying changes in stakeholder concerns or position over time
  • comparing issues across stakeholder groups, projects or locations
  • preparing stakeholder reports and management briefings
  • highlighting information that may require management attention.

The important shift is from using technology simply to store stakeholder information to using it to help understand what that information means.

AI is only as useful as the stakeholder data behind it

AI cannot compensate for poor stakeholder management practices. If interactions aren’t recorded, stakeholder records are incomplete, issues are inconsistently categorised or important relationship information exists only in people’s heads, the analysis will also be incomplete.

Organisations that want to use AI effectively therefore need strong foundations: consistent stakeholder records, good engagement data, appropriate data structures and clear governance.

AI doesn’t replace stakeholder relationships

Stakeholder management is fundamentally about people and relationships. AI cannot replace trust, empathy, judgement, local knowledge or the conversations required to build strong stakeholder relationships. Nor should an AI-generated assessment of a stakeholder be accepted uncritically as fact.

Instead, AI is most useful as a tool for augmenting human judgement.

It can help teams process more information, recognise patterns earlier and ask better questions. People can then apply context, experience and judgement to determine what those signals mean and what action, if any, should be taken.

The opportunity isn’t to automate stakeholder relationships. It is to give the people responsible for those relationships better stakeholder intelligence.

How to Choose Stakeholder Management Software

One final, important element to stakeholder management that we’ve touched on already is your software or tools. There’s a lot that goes into the stakeholder management process — to do it properly (especially at scale or over a long period of time), you really need the appropriate tools for the task.

Typically, organizations use one of the following tools:

  • Spreadsheets (like Excel) – fine for very small/simple programs
  • CRMs or Customer Relationship Managers (like Hubspot or Salesforce) – useful where stakeholder relationships largely overlap with customer/business-development relationships
  • SRMs or Stakeholder Relationship Management Systems – designed for ongoing stakeholder relationships, interactions, issues and engagement.
  • AI-enabled Stakeholder Intelligence Platforms (Simply Stakeholders) – adds qualitative analysis, sentiment, issue identification, summaries, relationship insights, strategic guidance and reporting.

Firstly, if you haven’t already, it really is time to leave the spreadsheets behind. They don’t offer enough collaborative features (including version control), automations/integrations, analysis/tracking, and reporting functionality. Plus, they’re difficult to offer the level of security and privacy that today’s organizations need when handling people’s data.

Secondly, it’s important to acknowledge that CRMs were just not designed for the job of managing complex stakeholder relationships. They are optimised for managing sales processes and commercial customer relationships. Many a large organisation has spent large amounts of money and time in trying to customise a CRM for a stakeholder relationship management purpose, only to have the entire project fail.

SRM systems while no longer new, are niche products designed specifically for stakeholder relationship management. Some products that are designed by stakeholder engagement experts have continued to evolve into Stakeholder Intelligence Platforms, making the best use of modern technology and adapting to the changing requirements for stakeholder engagement and relationship management.

CRM vs Stakeholder Relationship Management Software

Now, if you’re trying to decide between a CRM and SRM, it can be tricky if you’re new to these types of software. At first glance, they might even look pretty similar.

So, what are the similarities and differences between the two? When looking at most CRM products on the market from a stakeholder management perspective, compared with Simply Stakeholders, here’s what you’ll find:

CRM (Customer Relationship Management)

Designed to manage and track the sales process

SRM (Stakeholder Relationship Management)

Designed to manage and track stakeholder relationships and issues

✅ Cloud-Based

✅ Collaboration tools

✅ Reporting and analytics

✅ API Integrations

❌ Multiple Projects

❌ Stakeholder mapping

❌ AI-driven sentiment insights

❌ Project history

❌ Simplified data re-use

✅ Cloud-Based

✅ Collaboration tools

✅ Multiple Projects

✅ Reporting and analytics

✅ API Integrations

✅ Stakeholder mapping

✅ AI-driven sentiment insights

✅ Project history

✅ Simplified data re-use

While they have some core functionalities in common, you’ll soon find that a CRM falls short on managing complex projects and stakeholders, and lacks important features for analysis and tracking. So, if you’re serious about managing your stakeholders, make sure you trial purpose-built stakeholder software.

Read more about the difference between a CRM vs SRM. We’ve also covered the reasons CRMs might not be working for your project or organization.

Exploring software to support your stakeholder management process? When it comes to stakeholder software, Simply Stakeholders is a great choice for organizations of all sizes. It offers a user-friendly interface, one place for all your stakeholder interactions, stakeholder mapping, and cool features like AI-driven analysis.

What Does Good Stakeholder Management Look Like?

Stakeholder management maturity isn’t determined by how many stakeholder records an organisation has or how much engagement it conducts.

The more useful question is:

How effectively does the organisation turn stakeholder relationships and engagement into understanding, coordinated action and better decisions?

Organisations often progress through three broad stages.

Infographic showing the three stages of stakeholder management maturity

Moving from reactive to strategic stakeholder management doesn’t necessarily mean doing more engagement. It means getting more value from the engagement you already do.

At the reactive end of the spectrum, stakeholder knowledge is often fragmented across spreadsheets, inboxes and individual team members. Engagement happens in response to immediate needs, and reporting tends to describe activities.

A managed approach creates more consistency. Stakeholders, interactions and issues are recorded centrally; responsibilities are clearer; engagement is planned; and management has better visibility of stakeholder activity and concerns.

Strategic stakeholder management goes further. It connects information across stakeholders, relationships, interactions, issues and time to understand what is changing, why it matters and where attention is required.

The ultimate goal is to move from:

Recording stakeholder activity → Understanding stakeholder relationships → Generating stakeholder intelligence → Informing better decisions.

That is when stakeholder management becomes more than a process. It becomes an organisational capability.

Frequently Asked Questions

What is stakeholder management?

Stakeholder management is the systematic process of identifying, understanding, prioritising and building relationships with people and organisations that can affect — or are affected by — a project, policy or organisation.

It includes stakeholder analysis and mapping, engagement planning, recording interactions and issues, monitoring relationships and using stakeholder insights to inform decisions.

Why is stakeholder management important?

Stakeholder management helps organisations understand the people who can influence or be affected by their decisions. Done well, it can identify risks and opportunities earlier, improve decision-making, strengthen relationships, build trust and support, protect reputation and reduce the likelihood of conflict, delays or loss of social licence.

It also helps organisations ensure stakeholder knowledge is retained and shared rather than residing with individual team members.

What are the five steps of stakeholder management?

A practical stakeholder management process involves five steps:

  1. Identify and understand your stakeholders, including their needs, interests, concerns and expectations.
  2. Analyse and map their influence, impact, relationships, position and other relevant characteristics.
  3. Plan and prioritise the relationships and engagement activities that require attention.
  4. Engage and record interactions, issues, commitments and outcomes.
  5. Monitor, learn and adapt as stakeholders, relationships and circumstances change.

Stakeholder management should be treated as a continuous cycle rather than a one-off exercise.

What is the difference between stakeholder management and stakeholder engagement?

Stakeholder management is the broader process, covering stakeholder identification, analysis, mapping, planning, relationship management, information capture, monitoring and reporting.

Stakeholder engagement is the interaction itself — the conversations, consultation, communication, collaboration and other activities through which an organisation engages with its stakeholders.

Good stakeholder engagement is therefore an important part of effective stakeholder management.

What is stakeholder mapping?

Stakeholder mapping is the process of visually analysing and organising stakeholders according to characteristics that are important to a project or organisation.

Traditional stakeholder maps often consider factors such as power, influence, interest or impact. More advanced approaches can also consider stakeholder position, sentiment, relationship quality, salience and connections between stakeholders.

Because stakeholders and relationships change, maps should be reviewed and updated rather than treated as static documents.

What should a stakeholder management plan include?

A stakeholder management plan should identify the stakeholders relevant to a project or organisation, analyse their needs and characteristics, establish engagement priorities and objectives, define appropriate engagement approaches, assign responsibilities and explain how engagement and stakeholder relationships will be monitored.

The plan should be flexible enough to change as new stakeholders, issues and information emerge.

What is stakeholder relationship management software?

Stakeholder relationship management software, sometimes called an SRM or SRMS, is software designed specifically to help organisations manage stakeholder information, relationships and engagement.

Unlike a CRM, which is generally structured around customers, sales opportunities and revenue, stakeholder management software can track stakeholders, interactions, issues, commitments, sentiment, relationships, engagement activities and other information relevant to long-term stakeholder relationships.

How can AI be used in stakeholder management?

AI can help stakeholder teams analyse large amounts of qualitative engagement information more efficiently. Applications include summarising interactions, analysing sentiment, identifying recurring or emerging issues, detecting themes, reviewing relationship histories and preparing stakeholder reports.

AI is most effective when it supports rather than replaces human judgement. Its value depends heavily on the quality, completeness and consistency of the stakeholder data available for analysis.

Learn More

We’ve covered a lot of information here, but if you’d like to dive deeper into a specific aspect of stakeholder management (or you prefer your info in another format), you might like to explore these related resources:

Get In Touch

We’re always happy to share our knowledge and expertise. Get in touch and let us know what you think of the resources on this page. And be sure to subscribe to our email list to make sure you don’t miss future articles.

]]>
Guía de Análisis de Stakeholders https://simplystakeholders.com/resources/guides/guia-de-analisis-de-stakeholders/ Wed, 19 Oct 2022 10:02:15 +0000 https://dev.veribo.ro/simply-new/?post_type=guide&p=3539 Curioso de saber ¿qué es el análisis de stakeholders? ¿Por qué es importante? ¿cómo hacerlo bien?

O tal vez confundido por toda la información disponible pero difícil de entender…

Hemos creado esta guía, súper simple de digerir, para equiparte con definiciones y conceptos básicos además de proveer ideas más avanzadas para cuando estés listo en  profundizar sobre el análisis de stakeholders.

Si eres nuevo en el área de gestión de stakeholders o si trabajas con stakeholders en cualquier capacidad (incluidos gerentes de proyectos, gerentes de comunicaciones y ejecutivos), esta guía te ayudará a desarrollar lo que ya sabes y te desafiará en mejorar tu estrategia de análisis de stakeholders.

Entonces comencemos con las definiciones básicas, como: ¿qué es un stakeholder?

Definiciones Básicas del Análisis de Stakeholders

¿Quiénes son los stakeholders?Los stakeholders son cualquier persona o grupo involucrado en – o afectado por- un proyecto, organización o acción. Algunos ejemplos comunes de stakeholders incluyen empleados, accionistas, clientes, organismos gubernamentales, miembros del público, empresas y organismos reguladores.

Otros nombres usados para referirse a los stakeholders son: “Partes interesadas” o “Grupos de interés”, asi que a lo largo de esta guía utilizaremos estos tres nombres para que te vayas acostumbrando.

¿Qué es el Análisis de stakeholders?Este análisis implica:

  • Identificar quiénes son sus stakeholders,
  • Trabajar para comprender el interés e influencia de sus stakeholders en el proyecto,
  • Entender cómo su proyecto o trabajo los afectará
  • Y agruparlos en función de esta comprensión.

¿Qué es “Interés”?Cada stakeholder tiene un nivel diferente de interés en un proyecto, según su nivel de preocupación y cómo es probable que el proyecto los afecte. Algunas personas y grupos  son más activos, mientras que otros son más pasivos.

¿Qué es “Influencia”?Cada stakeholder tiene un nivel diferente de influencia en un proyecto, dependiendo de su capacidad para impactar el proceso y los resultados.

¿Qué es “Impacto”?Cada stakeholder puede afectar o verse afectado por el proyecto de diferentes maneras: positiva, negativa o una combinación de ambas.

7 Razones para hacer Análisis de Stakeholders

A smiling woman presenting her ideas while standing in front of a whiteboard

Este análisis es el primer paso lógico en su proceso de gestión o participación de stakeholders. Identificar, comprender y organizar a las partes interesadas puede ayudarte con lo siguiente:

1. Mejorar la calidad y precisión de las listas de stakeholders

El éxito que puedes tener con la gestión de las partes interesadas depende en gran medida de las listas que hagas de ellos. Si no son precisas o no están actualizadas, básicamente estás trabajando a ojos cerrados.

Analizar a tus stakeholders puede ayudar a detectar brechas y descubrir a quién falta involucrar.

(!) Pro-Tip: El momento perfecto para mejorar las listas es cuando migras a un sistema especializado de gestión de partes interesadas, porque te ayudará a limpiar duplicados y actualizar la información de contacto.

2. Comprender las motivaciones de las partes interesadas

¿Qué hace que las personas piensen y actúen de cierta manera? ¿Son sus creencias políticas o religiosas? ¿Sus valores y demografía? A través del análisis de las partes interesadas, puedes obtener nuevos conocimientos sobre las motivaciones de las personas lo cual te permitirá adaptar tu comunicación, áreas de enfoque y actividades para que sean más significativas y efectivas.

3. Saber en qué áreas enfocarse

Lo más probable es que estés viendo una larga lista de problemas que podrían ser relevantes para tus partes interesadas. Puede que no sea práctico abordar todos los problemas en tu estrategia de comunicación y compromiso, ciertamente no todos a la vez. El análisis de las partes interesadas puede ayudarte a descubrir qué problemas son los más importantes (y para quién) para que puedas concentrarte en estos primero. Por ejemplo, puedes descubrir que tus partes interesadas principales, se preocupan mucho por los impactos ambientales del proyecto que estás realizando, entonces, hablar más sobre los esfuerzos de tu organización para mitigar el impacto ambiental del proyecto podría ser una buena área de enfoque para generar una licencia social para operar.

4. Identifica a tus partes interesadas clave

El análisis de las partes interesadas puede ayudarte a identificar a quién debes prestar más atención. Tus partes interesadas clave son aquellas con mayor interés y/o mayor influencia, y puede ser fundamental obtener su opinión acerca del proyecto.

(!) Pro- Tip: Manten a tus partes interesadas clave informadas con mayor frecuencia y esto ayudará a mejorar la comunicación con ellos y potencialmente llevarte a construir capital social para el proyecto.

Compartimos más sobre esto en nuestro artículo sobre identificación y priorización de partes interesadas.

5. Reducir el agobio

Si estás viendo una lista de miles de stakeholders, puede volverse abrumador. ¿Por dónde empezar? ¿Con quién empezar?

El análisis de stakeholders ayuda a dividir la lista en grupos más pequeños y manejables. Esto puede facilitar mucho el desarrollo de estrategias de participación y comunicación adaptadas a las necesidades e intereses de cada grupo.

6. Priorizar el tiempo y los recursos limitados

El tiempo y los recursos limitados son uno de los principales desafíos para los profesionales lidiando con stakeholders ​​y los gerentes de proyectos. Si sólo tienes 10 horas cada semana para dedicar al proyecto, ¿cómo puedes realmente tener un impacto si tienes que distribuir ese tiempo entre tanta gente?

Probablemente no sea realista hablar con todos individualmente. Pero el análisis de stakeholders te ayudará a organizarlos en grupos, priorizar mejor tus recursos e incluso liberar tu tiempo para dar atención especializada al grupo stakeholders clave para el proyecto.

7. Crear un Caso para obtener más recursos

El análisis de stakeholders puede ayudarte a crear un Caso para demostrar cuáles son los recursos necesarios para administrar o involucrar a los grupos de interés en el proyecto. Creando un Caso podrás mostrar la cantidad de stakeholders, los diferentes grupos involucrados y los impactos potenciales (tanto positivos como negativos) que el proyecto/ organización tendrá si se gestiona adecuadamente.

 

Métodos Clásicos de Análisis de Stakeholders

Los mapas de stakeholders pueden ser una herramienta útil para el análisis porque ayudan a visualizar a los stakeholders en función de sus atributos y cómo se relacionan con el proyecto.

Algunos de los modelos  más utilizados tradicionalmente son los siguientes:

  • El modelo de prominencia (The Salience Model): a cada stakeholder se le asigna un nivel de poder, legitimidad y urgencia para determinar su prioridad
  • Gráfico de conocimiento básico de stakeholders (Stakeholder Knowledge Base Chart): los stakeholders se asignan en un cuadrante según su nivel de conocimiento y si apoyan o se oponen al proyecto o trabajo.
  • La tabla de poder/interés (Power/ Interest Grid): cada stakeholder se asigna en un cuadrante en función de su grado de poder y nivel de interés hacia el proyecto o trabajo.
  • La matriz de poder-previsibilidad (Power-Predictability Matrix): se asigna cada stakeholder en un cuadrante en función de su nivel de poder y previsibilidad.

A pesar de que los modelos anteriores se utilicen con frecuencia no significa que sean la mejor manera de mapear a los stakeholders. De hecho, hay algunos problemas con el enfoque clásico de estos mapeos.

Compartimos más sobre los diferentes enfoques de mapeo de stakeholders en este blog, pero para resumir, hay dos problemas principales.

  • En primer lugar, estos modelos están desactualizados, ya que el poder ya no está centralizado. Hoy en día, gracias a las redes sociales, los stakeholders de menor influencia pueden adquirir mayor poder si se conectan entre ellos, algo que es más fácil de hacer.
  • Y en segundo lugar, el lenguaje utilizado para describir a las personas en algunos de los modelos más antiguos es mejor dejarlo en el siglo anterior.

Afortunadamente, hay otras opciones…

Enfoque Moderno para el Mapeo de Stakeholders (Stakeholder Mapping)

Influence/Interest/Impact model for stakeholder mapping

 

Simply Stakeholders tiene una nueva y mejor forma de hacer este mapeo. Hacemos seguimiento de la participación y de los stakeholders en función a las 3 I’s:

  • Influencia
  • Interés
  • Impacto

Además de estos atributos, hacemos seguimiento del sentimiento de los stakeholders hacia el proyecto. Un análisis de sentimiento puede ayudar a comprender las emociones de sus stakeholders. ¿Tienen sentimientos positivos o negativos hacia el proyecto o hacia algun tema en particular? ¿Cómo está cambiando ese sentimiento con el tiempo?

Se puede analizar el sentimiento observando el tono y las palabras que los stakeholders usan en las respuestas de encuestas, grabaciones de llamadas, correos electrónicos y otras comunicaciónes.

Hablamos más sobre esto en nuestro blog: 5 simples pasos para comenzar con la gestión de datos de stakeholders

(!) Pro- Tip: si usas Simply Stakeholders, nuestro análisis de sentimiento – impulsado con Inteligencia Artificial- identificará automáticamente las emociones detrás de cada interacción registrada y etiquetará a los stakeholders de acuerdo a ello.

 

¿Cómo se hace un análisis de stakeholders?

Paso 1: Identificación de las partes interesadas

Antes de analizar a las partes interesadas, necesitas saber quiénes son. Comienza con una lista existente (si tienes una) y haz una lluvia de ideas para ver quién podría faltar.

Utilizar mapas mentales o una buena pizarra puede ser muy útil en este proceso. También vale la pena hablar con una variedad de personas en tu organización para averiguar con qué grupos e individuos tratan, así como con los que esperan encontrarse a lo largo del proyecto o trabajo. Cuantas más perspectivas obtengas, es menos probable que te falte alguien en tu lista.

Recuerda: tus partes interesadas son cualquier persona o grupo con la que debas consultar y/o que pueda afectar tu proyecto o verse afectado por él

(!) Pro- Tip: si no estás seguro de si alguien es una parte interesada genuina, agréguelo a la lista de todos modos para que puedas seguir avanzando en tu proceso de análisis. Luego puedes editar la lista una vez que hayas terminado con la lluvia de ideas.

Paso 2: Evaluación de las partes interesadas

Una vez que hayas identificado a todas las partes interesadas, es hora de evaluarlas y analizarlas. El proceso que uses aquí dependerá del método de mapeo con el que elijas trabajar. Es muy probable que observes el interés, impacto, poder, actitudes y otros atributos.

(!) Pro- Tip: una vez que hayas realizado el mapeo inicial de las partes interesadas, puedes ir más allá haciendoles una encuesta o llamada telefónica. Las preguntas pueden darte información en torno a sus preferencias de comunicación, motivaciones, qué los influye, a quiénes influyen y qué información les gustaría obtener del proyecto.

Este proceso de evaluación puede tomar tiempo, especialmente si tienes que trabajar con una lista larga de contactos, pero vale la pena hacer este paso correctamente ya que te preparará para el siguiente. Además, te permitirá adaptar (y priorizar) de manera efectiva tu enfoque de gestión de partes interesadas, comunicación y actividades de participación.

Paso 3: Agrupación de partes interesadas

Una vez que hayas terminado el mapeo de las partes interesadas, notarás que algunas tienen atributos similares. Estas partes interesadas pueden ser agrupadas y esto reducirá la complejidad de tu lista y permitirá adaptar el enfoque para satisfacer las necesidades de cada parte interesada de una manera más sencilla.

Este proceso también ayudará a identificar en qué enfocarse primero, según las principales preocupaciones de las partes interesadas clave. Desde aquí, podrás crear un plan de gestión, de participación o de comunicación.

Paso 4: Repetir

Las listas de partes interesadas no son estáticas. Las partes interesadas y grupos individuales cambiarán con el tiempo, junto con sus atributos, intereses, influencia, sentimiento y más. Es una buena idea analizar regularmente tu lista y ajustar la planificación y actividades en consecuencia, especialmente para proyectos y trabajos más largos.

(!) Pro- tip: El análisis regular de las partes interesadas es mucho más fácil cuando se usa una herramienta como Simply Stakeholders. Donde puedes integrar tu correo electrónico y SMS para que nuestro análisis de sentimiento (impulsado con Inteligencia Artificial) mantenga el etiquetado de las comunicaciónes y de las partes interseadas actualizado.

Además, esto puede ayudarte a monitorear cómo cambian las partes interesadas con el tiempo en respuesta a la comunicación, la participación, los cambios del proyecto y el entorno. Puedes usar esta información para comprender qué tan bien estás avanzando mientras aún existe la oportunidad de impactar en el resultado.

Cómo usar el análisis de partes interesadas

People at a table discussing their plans with hand gestures

Al analizar a las partes interesadas puedes obtener mucha información valiosa como, en quiénes debes enfocarte primero, cómo trabajar mejor con ellos, cuándo (y con qué frecuencia) interactuar con ellos y en qué problemas debes centrarte. Estos conocimientos se pueden utilizar de muchas maneras diferentes, como…

1. Creando un plan de stakeholders

El análisis de stakeholders es el primer paso en todo buen plan porque solo puedes identificar las estrategias adecuadas después de saber quiénes son sus partes interesadas.

Si quieres obtener más información sobre como crear un plan de stakeholders paso a paso. Descarga nuestra guía gratuita “Cómo crear un plan de gestión de partes interesadas”.

2. Gestión de las partes interesadas (Stakeholder Management)

La gestión de stakeholders es un término general que abarca una variedad de métodos y enfoques para administrar, monitorear e interactuar con las partes interesadas.

El análisis de stakeholders  puede ayudar a comprender a quién estás administrando, las formas más efectivas de administrarlos y qué áreas podrían necesitar un monitoreo más cercano.

3. Participación pública

La participación pública también se conoce como involucramiento ciudadano o participación ciudadana. Este enfoque de la gestión de stakeholders facilita un entorno en el que los miembros del público (que se ven afectados por una decisión o están interesados en ella) esten involucrados en el proceso.

El análisis de las partes interesadas puede ayudar a respaldar la rendición de cuentas en la participación pública. Por ejemplo, puede ayudar a identificar quién constituye “el público” para que puedas trabajar en lograr una participación equilibrada en todos los grupos.

4. Compromiso o Participación de las partes interesadas (Stakeholder Engagement)

La participación de las partes interesadas se centra en construir relaciones con ellas, incluyendo relaciones internas como externas. El objetivo de la participación es obtener el apoyo de las partes interesadas y/o beneficiarse de sus perspectivas.

Al igual que otros enfoques, el análisis constituye el primer paso en un plan de participación de las partes interesadas. Porque puede ayudar a identificar el grado de interés/influencia de las partes interesadas además de saber de quiénes necesitas información sobre diferentes temas (aclarando esto lo antes posible en el proceso).

5. Creación de un plan de comunicación

El análisis de las partes interesadas a menudo forma parte de un plan de comunicación. Este puede revelar información útil sobre con quién necesita comunicarse, incluyendo:

  • Qué temas quieren escuchar más
  • Temas sensibles a evitar o abordar con mayor cuidado
  • Brechas de conocimiento y stakeholders que podrían beneficiarse con información adicional
  • Qué plataformas/medios son mejores para llegar a cada grupo
  • Con qué frecuencia necesita comunicarse con diferentes grupos

6. Gestión de proyectos

Dado que la gestión de partes interesadas forma una parte importante de la gestión de proyectos, los directores de proyectos pueden beneficiarse del análisis antes de que comience el trabajo. El análisis de las partes interesadases es especialmente útil para identificar a los stakeholders  que podría haber pasado por alto. Y puede ayudar a identificar posibles problemas y oportunidades desde el principio, por ejemplo, un gerente que no está de acuerdo con el proyecto o un partidario del cambio que puede ayudar a influir a otros.

 

¿Quieres evitar estos errores comunes?

Nuestro equipo ha estado en la industria de la gestión de stakeholders por varias decades ahora y han identificado que las organizaciones constantemente “tropiezan con la misma piedra” en las siguientes areas:

1. Solo hacer el análisis de stakeholders al inicio del proyecto

Comenzar el inicio del proyecto con el análisis de stakeholders es una decisión inteligente. Sin embargo, es sumamente importante revisar su lista con regularidad para mantenerla actualizada y controlar los cambios.

2. Usar sólo un método de mapeo de stakeholders

Si bien la tabla de poder/interés (Power/ Interest Grid) es un método popular, no es un marco perfecto. Es una buena idea usar múltiples métodos para llegar a un análisis más completo. Como lo mencionamos antes, nosotros somos fanáticos del método de las 3 I’s: Interés, Influencia e Impacto.

3. No usar los conocimientos

Identificar y mapear a los stakeholders es un ejercicio útil que requiere tiempo y esfuerzo. Así que maximiza el valor que obtienes de los conocimientos utilizándolos para dar forma a las discusiones y desarrollar planes, estrategias e informes.

Si quieres saber más detalles sobre estos errores lee este articulo

 

Introducción a conceptos avanzados de análisis de partes interesadas

Hemos mantenido esta guía súper simple, pero si estás buscando expandir tus conocimientos con conceptos e ideas más avanzadas, te presentamos los siguientes temas.

Mapeo de las Relaciones con stakeholders (Stakeholder Relationship Mapping)

Si bien observamos el mapeo de stakeholders en función de sus atributos, no hemos discutido las relaciones de stakeholders con mayor detalle. El mapeo de relaciones de los stakeholders se utiliza para visualizar cómo los stakeholders se vinculan entre ellos. Esto puede proporcionar información adicional sobre el poder y la influencia, así como formas lógicas de agrupar a los stakeholders.

Análisis y parcialidad de los stakeholders

No nos referimos a la parcialidad de los stakeholders (que pueden ser descubiertos cuando se hace el análisis), sino a la parcialidad que tu y tu equipo puedan tener.

Un buen análisis de stakeholders implica que seas lo más objetivo posible. Sin embargo, a veces es más fácil decirlo que hacerlo.

El prejuicio puede ocurrir en cualquier momento durante el análisis de las partes interesadas por varias razones:

  • Uno no sabe, lo que no sabe (lo que limita la identificación del stakeholder)
  • Conceptos como ‘poder’ e ‘interés’ pueden ser difíciles de definir
  • Experiencias propias podrían afectar cómo agrupas a los stakeholders y los problemas en los que se enfocan.

Privacidad de las partes interesadas

La privacidad es una consideración importante cada vez que se recopila datos sobre los stakeholders. Esto significa seguir las leyes locales pertinentes, asegurarse de que las plataformas sean seguras, asegurarse de tener los permisos correctos y administrar cómo el resto del equipo usa y comparte la información.

 

Análisis sencillo con Simply Stakeholders

Stylized graphic showing a person standing in front of a user interface that visualizes progress

Simply Stakeholders es una herramienta inteligente (pero sencilla) de gestión de relaciones de las partes interesadas, que facilita más que nunca el mapeo visual de los stakeholders en función  a la influencia, el interés y el impacto que estos tienen.

No solo eso, sino que nuestro análisis de sentimiento esta respaldado por Inteligencia Artificial (IA) lo que permite mantener la información actualizada a lo largo de todo el proyecto.

¿Interesado en aprender más? Echa un vistazo a nuestras características o contáctanos y solicita tu consulta gratis con uno de nuestros expertos.

]]>